IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 3421 Cutlery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0199 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,483 $9,013 Implemented
UA0199 # 01 Y:2018 01 2018 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,877 $13,552 Implemented
UA0199 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $182 $698 Implemented
UA0199 # 08 Y:2018 08 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $919 Implemented
BS0023 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,676 $986 Implemented
BS0023 # 01 Y:2013 01 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,128 $10 Implemented
BS0023 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $983 $2,950 Implemented
BS0023 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $49 $161 Implemented
MA0677 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,225 $200 Implemented
MA0677 # 01 Y:2011 01 2011 REDUCE VENTILATION AIR $9,048 $2,585 Implemented
MA0677 # 03 Y:2011 03 2011 INSTALL TIMERS AND/OR THERMOSTATS $1,514 $5,967 Implemented
MA0677 # 06 Y:2011 06 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $362 $500 Implemented
MA0677 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $107 $100 Implemented
LL0292 # 02 Y:2008 02 2008 AIR CONDITION ONLY SPACE NECESSARY $16,129 $0 Implemented
LL0292 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,271 $1,520 Implemented
LL0292 # 04 Y:2008 04 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,715 $0 Implemented
LL0292 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,040 $30 Implemented
LL0292 # 07 Y:2008 07 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,599 $792 Implemented
LL0292 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $238 $180 Implemented
LL0292 # 09 Y:2008 09 2008 INSULATE BARE EQUIPMENT $80 $242 Implemented
LL0280 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,405 $1,880 Implemented
LL0280 # 02 Y:2007 02 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,024 $210 Implemented
LL0280 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $287 $30 Implemented
WI0434 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,556 $740 Implemented
WI0434 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,191 $588 Implemented