IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 3423 Hand And Edge Tools, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0797 # 04 Y:2019 04 2019 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,739 $3,000 Implemented
MA0673 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,078 $200 Implemented
MA0673 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,772 $540 Implemented
MA0673 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $4,145 $1,370 Implemented
MA0240 # 01 Y:1992 01 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $83,013 $80 Implemented
MA0240 # 08 Y:1992 08 1992 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,022 $2,200 Implemented
MA0240 # 07 Y:1992 07 1992 REPAIR OR REPLACE STEAM TRAPS $1,348 $240 Implemented
MA0240 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $1,400 $400 Implemented
MA0240 # 05 Y:1992 05 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,896 $0 Implemented
MA0240 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,460 $2,355 Implemented
MA0240 # 03 Y:1992 03 1992 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $16,723 $11 Implemented
MA0175 # 05 Y:1990 05 1990 OPTIMIZE PLANT POWER FACTOR $1,528 $2,710 Implemented
MA0175 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,216 $5,256 Implemented
MA0175 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $385 $0 Implemented
MA0057 # 05 Y:1986 05 1986 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $2,262 $7,500 Implemented
MA0057 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $377 $300 Implemented
MA0057 # 02 Y:1986 02 1986 REDUCE GLAZED AREAS IN BUILDINGS $3,959 $8,455 Implemented
MA0057 # 01 Y:1986 01 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,191 $2,500 Implemented
MA0017 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $466 $200 Implemented
MA0017 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $114 Implemented
MA0017 # 03 Y:1985 03 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,605 $0 Implemented
MA0017 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $106 $165 Implemented