IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

586

matching recommendations
Reset
SIC 3429 Hardware, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0404 # 01 Y:2001 01 2001 $25,650 $0 Implemented
OR0404 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,457 $1,102 Implemented
OR0404 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $546 $1,065 Implemented
OR0404 # 04 Y:2001 04 2001 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $859 $2,400 Implemented
OR0404 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $448 $500 Implemented
OR0404 # 06 Y:2001 06 2001 OPTIMIZE PLANT POWER FACTOR $250 $700 Not Implemented
MI0003 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,015 $10,000 Not Implemented
MI0003 # 02 Y:2001 02 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $40,000 $15,120 Not Implemented
MI0003 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,044 $312 Implemented
MI0003 # 04 Y:2001 04 2001 METER WASTE WATER $25,076 $3,650 Not Implemented
MI0003 # 05 Y:2001 05 2001 $125,000 $136,000 Not Implemented
MI0003 # 06 Y:2001 06 2001 $40,000 $2,900 Implemented
MA0483 # 01 Y:2001 01 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $8,700 $0 Implemented
MA0483 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,400 $14,000 Not Implemented
MA0483 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,200 $11,000 Not Implemented
MA0483 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $2,250 $12,000 Not Implemented
MA0483 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,650 $800 Implemented
MA0483 # 06 Y:2001 06 2001 USE RADIANT HEATER FOR SPOT HEATING $1,050 $6,000 Not Implemented
MA0483 # 07 Y:2001 07 2001 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $570 $2,500 Implemented
MA0474 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,827 $1,000 Implemented
MA0474 # 02 Y:2000 02 2000 INSTALL TIMERS AND/OR THERMOSTATS $4,760 $0 Implemented
MA0474 # 03 Y:2000 03 2000 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,838 $13,000 Not Implemented
MA0474 # 04 Y:2000 04 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $746 $4,000 Not Implemented
MA0474 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $512 $1,000 Implemented
MA0474 # 06 Y:2000 06 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $371 $100 Implemented