IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 3429 Hardware, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0187 # 09 Y:2000 09 2000 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,686 $25,740 Not Implemented
NC0187 # 08 Y:2000 08 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $75 $260 Not Implemented
NC0187 # 07 Y:2000 07 2000 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $3,506 $5,416 Not Implemented
NC0187 # 06 Y:2000 06 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $17,072 $24,000 Not Implemented
NC0187 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $689 $1,428 Not Implemented
NC0187 # 04 Y:2000 04 2000 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $7,128 $20,000 Not Implemented
NC0187 # 03 Y:2000 03 2000 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $975 $2,640 Not Implemented
NC0187 # 02 Y:2000 02 2000 UPGRADE CONTROLS ON COMPRESSORS $10,033 $5,000 Not Implemented
NC0187 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,836 $1,000 Not Implemented
TN0639 # 06 Y:1998 06 1998 USE OPTIMUM THICKNESS INSULATION $470 $1,125 Not Implemented
TN0639 # 01 Y:1998 01 1998 $74,290 $26,180 Implemented
TN0639 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $754 $950 Implemented
TN0639 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $5,440 $3,440 Implemented
TN0639 # 04 Y:1998 04 1998 RECOVER AND REUSE WASTE MATERIAL $1,200 $0 Implemented
TN0639 # 03 Y:1998 03 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $4,680 $0 Implemented
NC0114 # 05 Y:1997 05 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $110 $56 Not Implemented
NC0114 # 06 Y:1997 06 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $9,198 $12,000 Not Implemented
NC0114 # 07 Y:1997 07 1997 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $605 $250 Implemented
NC0114 # 08 Y:1997 08 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,459 $5,200 Implemented
NC0114 # 09 Y:1997 09 1997 $3,150 $1,096 Implemented
NC0114 # 10 Y:1997 10 1997 $4,888 $10,500 Implemented
NC0114 # 11 Y:1997 11 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $93,603 $14,305 Not Implemented
NC0114 # 04 Y:1997 04 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $179 $400 Implemented
NC0114 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,248 $510 Implemented
NC0114 # 02 Y:1997 02 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,857 $2,925 Implemented