IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 343 Plumbing And Heating, Except Electric
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0143 # 04 Y:2014 04 2014 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,178 $100 Implemented
TT0143 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,223 $75 Implemented
MZ0154 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,059 $1,260 Implemented
MZ0154 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $383 $850 Implemented
TT0130 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,191 $6,041 Implemented
TT0130 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,989 $20,000 Implemented
TT0130 # 03 Y:2014 03 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,677 $4,500 Implemented
TT0130 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,560 $12,150 Implemented
TT0130 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $29,307 $44,000 Implemented
TT0116 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,073 $12,258 Implemented
TN0555 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $818 $620 Implemented
TN0555 # 09 Y:1995 09 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,409 $0 Implemented
TN0555 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $586 $442 Implemented
TN0555 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $435 Implemented
TN0555 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $349 $490 Implemented
TN0555 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,689 $0 Implemented
TN0555 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $805 $2,200 Implemented
TN0555 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $3,355 $2,320 Implemented
TN0505 # 01 Y:1993 01 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,734 $4,088 Implemented
TN0505 # 08 Y:1993 08 1993 OPTIMIZE PLANT POWER FACTOR $6,244 $15,800 Implemented
TN0505 # 07 Y:1993 07 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $525 $1,380 Implemented
TN0505 # 04 Y:1993 04 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $6,669 $15,914 Implemented
TN0505 # 02 Y:1993 02 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,127 $730 Implemented
TN0295 # 04 Y:1986 04 1986 INSTALL SET-BACK TIMERS $3,137 $0 Implemented
TN0295 # 03 Y:1986 03 1986 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,728 $2,700 Implemented