IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 343 Plumbing And Heating, Except Electric
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0166 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $321 $255 n/a
NV0166 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $180 $194 n/a
NV0166 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $81 $0 n/a
NV0166 # 05 Y:2000 05 2000 AUTOMATE FINISHING PROCESS $195,000 $3,465 n/a
NV0166 # 01 Y:2000 01 2000 AIR CONDITION ONLY SPACE NECESSARY $32,352 $17,000 n/a
ND0354 # 04 Y:2000 04 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,145 $2,970 Not Implemented
ND0354 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,533 $14,644 Implemented
ND0354 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $415 $660 Implemented
ND0354 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $355 $240 Implemented
ND0354 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,506 $300 Implemented
ND0354 # 06 Y:2000 06 2000 DEVELOP A REPAIR/REPLACE POLICY $8,446 $27,572 Implemented
ND0354 # 07 Y:2000 07 2000 MINIMIZE WATER USAGE $2,685 $6,840 Implemented
ND0354 # 08 Y:2000 08 2000 PAY BILLS ON TIME TO AVOID LATE FEES $1,731 $0 Implemented
KU0537 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $970 $1,480 Not Implemented
KU0537 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $200 Not Implemented
KU0537 # 04 Y:2000 04 2000 METER WASTE WATER $2,980 $1,910 Not Implemented
KU0537 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $580 $0 Not Implemented
KU0537 # 05 Y:2000 05 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,180 $1,740 Not Implemented
HO0229 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,928 $20,007 Not Implemented
HO0229 # 02 Y:2000 02 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,032 $700 Not Implemented
HO0229 # 09 Y:2000 09 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,200 $4,500 Not Implemented
HO0229 # 12 Y:2000 12 2000 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $1,040 $100 Not Implemented
HO0229 # 10 Y:2000 10 2000 CONDENSE OPERATION INTO ONE BUILDING $4,160 $6,000 Not Implemented
HO0229 # 05 Y:2000 05 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $68,250 $500,000 Not Implemented
HO0229 # 08 Y:2000 08 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $5,850 $3,000 Not Implemented