Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 343 | Plumbing And Heating, Except Electric |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0111 # 06 Y:2001 | 06 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,480 | $0 | Implemented |
LL0111 # 05 Y:2001 | 05 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $552 | $0 | Implemented |
LL0111 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,892 | $2,400 | Implemented |
LL0111 # 01 Y:2001 | 01 | 2001 | INSTALL OCCUPANCY SENSORS | $605 | $74 | Not Implemented |
LL0111 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $9,873 | $10,440 | Implemented |
LL0111 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,253 | $0 | Not Implemented |
MI0008 # 07 Y:2001 | 07 | 2001 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $105,300 | $1,212 | n/a |
NC0212 # 01 Y:2001 | 01 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,685 | $25 | Implemented |
MI0008 # 06 Y:2001 | 06 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $78,789 | $44,200 | n/a |
MI0008 # 05 Y:2001 | 05 | 2001 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $28,850 | $400 | n/a |
MI0008 # 04 Y:2001 | 04 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $22,533 | $40 | n/a |
MI0008 # 03 Y:2001 | 03 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,272 | $5 | n/a |
MI0008 # 02 Y:2001 | 02 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,780 | $87 | n/a |
MI0008 # 01 Y:2001 | 01 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,994 | $125 | n/a |
NC0212 # 11 Y:2001 | 11 | 2001 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $825 | $0 | Not Implemented |
NC0212 # 10 Y:2001 | 10 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,136 | $2,093 | Not Implemented |
NC0212 # 09 Y:2001 | 09 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,215 | $18,300 | Not Implemented |
NC0212 # 08 Y:2001 | 08 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,950 | $8,846 | Not Implemented |
NC0212 # 07 Y:2001 | 07 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,001 | $1,589 | Not Implemented |
NC0212 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $392 | $120 | Not Implemented |
NC0212 # 05 Y:2001 | 05 | 2001 | USE OPTIMUM THICKNESS INSULATION | $3,300 | $5,000 | Not Implemented |
NC0212 # 04 Y:2001 | 04 | 2001 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,456 | $800 | Not Implemented |
NC0212 # 03 Y:2001 | 03 | 2001 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $2,554 | $11,000 | Not Implemented |
NC0212 # 02 Y:2001 | 02 | 2001 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $5,740 | $5,000 | Not Implemented |