IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3431 Metal Sanitary Ware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0116 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,073 $12,258 Implemented
WV0428 # 14 Y:2011 14 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,082 $600 Implemented
WV0428 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,120 $700 Implemented
WV0428 # 09 Y:2011 09 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,253 $2,000 Implemented
WV0428 # 06 Y:2011 06 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,763 $1,000 Implemented
WV0428 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $11,317 $815 Implemented
WV0428 # 15 Y:2011 15 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,154 $25 Implemented
WV0428 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,236 $60,550 Implemented
IC0181 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,521 $600 Implemented
IC0181 # 14 Y:2011 14 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $522 $0 Implemented
IC0181 # 13 Y:2011 13 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $33 $0 Implemented
IC0181 # 11 Y:2011 11 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,962 $4,127 Implemented
IC0181 # 10 Y:2011 10 2011 REPAIR OR REPLACE STEAM TRAPS $7,948 $1,458 Implemented
IC0181 # 08 Y:2011 08 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,382 $0 Implemented
IC0181 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $717 $2,886 Implemented
IC0181 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,391 $4,830 Implemented
IC0181 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $533 $0 Implemented
IC0181 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $19,167 $1,700 Implemented
IC0181 # 02 Y:2011 02 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $850 $402 Implemented
IC0181 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $91 $29 Implemented
AM0099 # 03 Y:1990 03 1990 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,680 $0 Implemented
AM0099 # 12 Y:1990 12 1990 INSTALL SET-BACK TIMERS $739 $52 Implemented
AM0099 # 10 Y:1990 10 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,416 $400 Implemented
AM0099 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,629 $13,300 Implemented
AM0099 # 06 Y:1990 06 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,180 $1,200 Implemented