IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3432 Plumbing Fixture Fittings And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0336 # 12 Y:2006 12 2006 SCHEDULE DELIVERIES ACCORDING TO DEMAND $79,200 $25,000 Not Implemented
NC0336 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,361 $50 Not Implemented
NC0336 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,046 $1,735 Not Implemented
NC0336 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,535 $100 Implemented
NC0336 # 08 Y:2006 08 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,883 $20,000 Implemented
NC0336 # 07 Y:2006 07 2006 AIR CONDITION ONLY SPACE NECESSARY $11,658 $6,500 Not Implemented
NC0336 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $2,156 $455 Not Implemented
NC0336 # 05 Y:2006 05 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $12,198 $7,290 Implemented
NC0336 # 04 Y:2006 04 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,620 $20,000 Not Implemented
NC0336 # 03 Y:2006 03 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $2,620 $1,500 Not Implemented
NC0336 # 02 Y:2006 02 2006 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $8,595 $1,300 Not Implemented
NC0336 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $13,979 $24,586 Not Implemented
NC0212 # 10 Y:2001 10 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,136 $2,093 Not Implemented
NC0212 # 11 Y:2001 11 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $825 $0 Not Implemented
NC0212 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,215 $18,300 Not Implemented
NC0212 # 08 Y:2001 08 2001 RECOVER WASTE HEAT FROM EQUIPMENT $6,950 $8,846 Not Implemented
NC0212 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,001 $1,589 Not Implemented
NC0212 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $392 $120 Not Implemented
NC0212 # 05 Y:2001 05 2001 USE OPTIMUM THICKNESS INSULATION $3,300 $5,000 Not Implemented
NC0212 # 04 Y:2001 04 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,456 $800 Not Implemented
NC0212 # 03 Y:2001 03 2001 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,554 $11,000 Not Implemented
NC0212 # 02 Y:2001 02 2001 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $5,740 $5,000 Not Implemented
NC0212 # 01 Y:2001 01 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $5,685 $25 Implemented
NC0156 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,453 $15,000 Not Implemented
NC0156 # 05 Y:1999 05 1999 USE REACTIVE RINSING $2,015 $325 Not Implemented