Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
214
matching recommendationsSIC | 3432 | Plumbing Fixture Fittings And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0043 # 03 Y:2009 | 03 | 2009 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,472 | $3,500 | Implemented |
DL0043 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $960 | $2,000 | Not Implemented |
DL0043 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $600 | $950 | Not Implemented |
DL0043 # 01 Y:2009 | 01 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,690 | $18,300 | Not Implemented |
DL0043 # 02 Y:2009 | 02 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,192 | $0 | Implemented |
DL0043 # 07 Y:2009 | 07 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,060 | $0 | Implemented |
DL0043 # 06 Y:2009 | 06 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $470 | $510 | Not Implemented |
NC0336 # 07 Y:2006 | 07 | 2006 | AIR CONDITION ONLY SPACE NECESSARY | $11,658 | $6,500 | Not Implemented |
NC0336 # 03 Y:2006 | 03 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $2,620 | $1,500 | Not Implemented |
NC0336 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,979 | $24,586 | Not Implemented |
NC0336 # 09 Y:2006 | 09 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,535 | $100 | Implemented |
NC0336 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,361 | $50 | Not Implemented |
NC0336 # 08 Y:2006 | 08 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $18,883 | $20,000 | Implemented |
NC0336 # 06 Y:2006 | 06 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,156 | $455 | Not Implemented |
NC0336 # 05 Y:2006 | 05 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $12,198 | $7,290 | Implemented |
NC0336 # 04 Y:2006 | 04 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,620 | $20,000 | Not Implemented |
NC0336 # 02 Y:2006 | 02 | 2006 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $8,595 | $1,300 | Not Implemented |
NC0336 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,046 | $1,735 | Not Implemented |
NC0336 # 12 Y:2006 | 12 | 2006 | SCHEDULE DELIVERIES ACCORDING TO DEMAND | $79,200 | $25,000 | Not Implemented |
SD0367 # 04 Y:2005 | 04 | 2005 | COVER OPEN TANKS | $5,688 | $3,722 | Not Implemented |
SD0367 # 01 Y:2005 | 01 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,944 | $23,500 | Not Implemented |
SD0367 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,803 | $1,750 | Not Implemented |
SD0367 # 03 Y:2005 | 03 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $7,652 | $8,000 | Not Implemented |
SD0367 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,834 | $15,130 | Not Implemented |
SD0367 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,567 | $100 | Not Implemented |