IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

388

matching recommendations
Reset
SIC 3433 Heating Equipment, Except Electric
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0124 # 04 Y:1995 04 1995 OPTIMIZE PLANT POWER FACTOR $977 $1,120 Implemented
UL0124 # 03 Y:1995 03 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $848 $1,000 Not Implemented
UL0124 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,406 $3,609 Not Implemented
UL0124 # 06 Y:1995 06 1995 USE AUTOMATIC CLEANING EQUIPMENT $2,033 $1,615 Not Implemented
UL0124 # 07 Y:1995 07 1995 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $92,792 $17,600 Not Implemented
UL0124 # 08 Y:1995 08 1995 USE "WASH-LESS" PROCESSING EQUIPMENT $99,415 $9,240 Not Implemented
UL0124 # 09 Y:1995 09 1995 REDUCE SCRAP PRODUCTION $3,333 $3,124 Not Implemented
UL0124 # 10 Y:1995 10 1995 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $77 $75 Not Implemented
UL0124 # 11 Y:1995 11 1995 RECYCLE CLEANING SOLVENT AND REUSE $-76 $89 Not Implemented
UL0124 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,714 $1,789 Not Implemented
UL0124 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,134 $43 Not Implemented
IA0089 # 01 Y:1994 01 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,467 $30 Not Implemented
IA0089 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,121 $400 Implemented
IA0089 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,520 $185 Implemented
IA0089 # 04 Y:1994 04 1994 USE PHOTOCELL CONTROLS $554 $275 Not Implemented
IA0089 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $441 $693 Not Implemented
AM0204 # 01 Y:1994 01 1994 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,520 $1,000 Implemented
AM0204 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,520 $1,500 Implemented
AM0204 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $660 $13 Implemented
AM0204 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $100 $185 Implemented
AM0204 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102 $52 Implemented
AM0204 # 06 Y:1994 06 1994 FILTER AND REUSE HYDRAULIC OIL $1,800 $0 Implemented
AM0204 # 07 Y:1994 07 1994 DISTILL CONTAMINATED SOLVENTS FOR REUSE $95 $6,000 Not Implemented
AM0191 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,900 $2,300 Implemented
AM0191 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,800 $3,200 Implemented