Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 3433 | Heating Equipment, Except Electric |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TP0007 # 07 Y:1999 | 07 | 1999 | INSTALL OCCUPANCY SENSORS | $300 | $987 | n/a |
TP0007 # 06 Y:1999 | 06 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $177 | $1,095 | n/a |
TP0007 # 05 Y:1999 | 05 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,425 | $0 | n/a |
TP0007 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,560 | $800 | n/a |
TP0007 # 03 Y:1999 | 03 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,254 | $2,071 | n/a |
TP0007 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,504 | $20,190 | n/a |
TP0007 # 01 Y:1999 | 01 | 1999 | OPTIMIZE PLANT POWER FACTOR | $9,968 | $8,500 | n/a |
AM0204 # 07 Y:1994 | 07 | 1994 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $95 | $6,000 | Not Implemented |
AM0204 # 01 Y:1994 | 01 | 1994 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,520 | $1,000 | Implemented |
AM0204 # 02 Y:1994 | 02 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,520 | $1,500 | Implemented |
AM0204 # 03 Y:1994 | 03 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $660 | $13 | Implemented |
AM0204 # 04 Y:1994 | 04 | 1994 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $100 | $185 | Implemented |
AM0204 # 05 Y:1994 | 05 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $102 | $52 | Implemented |
AM0204 # 06 Y:1994 | 06 | 1994 | FILTER AND REUSE HYDRAULIC OIL | $1,800 | $0 | Implemented |
AM0191 # 05 Y:1993 | 05 | 1993 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $750 | $0 | Implemented |
AM0191 # 07 Y:1993 | 07 | 1993 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $570 | $0 | Implemented |
AM0191 # 06 Y:1993 | 06 | 1993 | PAY UTILITY BILLS ON TIME | $700 | $0 | Implemented |
AM0191 # 04 Y:1993 | 04 | 1993 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $8,650 | $3,680 | Not Implemented |
AM0191 # 03 Y:1993 | 03 | 1993 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,200 | $4,100 | Implemented |
AM0191 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,800 | $3,200 | Implemented |
AM0191 # 01 Y:1993 | 01 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,900 | $2,300 | Implemented |
AM0140 # 04 Y:1992 | 04 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $222 | $142 | Not Implemented |
AM0140 # 03 Y:1992 | 03 | 1992 | INSTALL SET-BACK TIMERS | $150 | $310 | Not Implemented |
AM0140 # 02 Y:1992 | 02 | 1992 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $430 | $1,000 | Not Implemented |
AM0140 # 01 Y:1992 | 01 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,170 | $1,980 | Not Implemented |