IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

327

matching recommendations
Reset
SIC 3433 Heating Equipment, Except Electric
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0822 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,449 $500 Not Implemented
UD0822 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $677 $125 Not Implemented
UD0822 # 02 Y:2010 02 2010 INSTALL WIND POWERED ELECTRIC GENERATOR $244,092 $1,216,000 Not Implemented
UD0822 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,399 $8,760 Not Implemented
UD0822 # 09 Y:2010 09 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,033 $39,100 Not Implemented
UD0822 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,724 $24,375 Not Implemented
UD0822 # 06 Y:2010 06 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,400 $2,000 Not Implemented
UD0822 # 07 Y:2010 07 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,219 $5,273 Not Implemented
UD0822 # 12 Y:2010 12 2010 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $1,500 $14,900 Not Implemented
UD0822 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $609 $609 Not Implemented
UD0822 # 11 Y:2010 11 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,147 $2,100 Not Implemented
UD0822 # 10 Y:2010 10 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,483 $63 Implemented
MZ0016 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,548 $2,135 Not Implemented
MZ0016 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,880 $1,120 Implemented
MZ0016 # 03 Y:2007 03 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,312 $3,000 Not Implemented
SU0188 # 02 Y:2004 02 2004 PAY UTILITY BILLS ON TIME $1,203 $0 Implemented
SU0188 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $5,424 $34,382 Not Implemented
SU0188 # 01 Y:2004 01 2004 ADVERTISE PRODUCT OR SERVICE $10,418 $0 Implemented
SU0188 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $548 $184 Not Implemented
SU0188 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $883 $0 Not Implemented
LE0179 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,185 $0 Not Implemented
LE0179 # 01 Y:2004 01 2004 REDUCE VENTILATION AIR $10,362 $942 Not Implemented
LE0179 # 02 Y:2004 02 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,781 $0 Implemented
LE0179 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $960 $750 Not Implemented
LE0179 # 06 Y:2004 06 2004 USE SYNTHETIC LUBRICANT $573 $500 Implemented