IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,527

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0118 # 07 Y:1984 07 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $463 $0 Implemented
KU0118 # 11 Y:1984 11 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $519 $200 Implemented
KU0118 # 12 Y:1984 12 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $325 $0 Implemented
UD0116 # 02 Y:1984 02 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,320 $3,000 Implemented
UD0116 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,013 $670 Implemented
UD0116 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $18,628 $99,000 Implemented
KU0114 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,440 $1,100 Implemented
KU0114 # 05 Y:1984 05 1984 AIR CONDITION ONLY SPACE NECESSARY $1,407 $263 Implemented
OK0121 # 01 Y:1984 01 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,384 $2,880 Implemented
OK0121 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,510 $174,400 Implemented
OK0121 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,956 $928 Implemented
OK0113 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $198 $235 Implemented
OK0108 # 01 Y:1983 01 1983 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,912 $11,990 Implemented
OK0108 # 02 Y:1983 02 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,027 $700 Implemented
OK0108 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,117 $22,000 Implemented
OK0108 # 05 Y:1983 05 1983 INSTALL TIMERS AND/OR THERMOSTATS $203 $296 Implemented
OK0108 # 06 Y:1983 06 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102 $142 Implemented
UD0091 # 06 Y:1983 06 1983 REDESIGN PROCESS $13,696 $30,000 Implemented
OK0087 # 03 Y:1983 03 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,133 $250 Implemented
KU0083 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $3,583 $200 Implemented
KU0073 # 02 Y:1983 02 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,086 $3,279 Implemented
KU0073 # 05 Y:1983 05 1983 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $3,151 $1,000 Implemented
KU0073 # 06 Y:1983 06 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,265 $0 Implemented
KU0073 # 07 Y:1983 07 1983 OPTIMIZE PLANT POWER FACTOR $2,135 $2,485 Implemented
KU0073 # 08 Y:1983 08 1983 INSTALL AUTOMATIC STACK DAMPER $1,787 $1,544 Implemented