IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,546

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TS0001 # 03 Y:1984 03 1984 USE MINIMUM SAFE OVEN VENTILATION $335 $300 Implemented
TS0001 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $169 $200 Implemented
TS0002 # 01 Y:1984 01 1984 INSTALL SET-BACK TIMERS $2,178 $0 Implemented
TS0002 # 03 Y:1984 03 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $813 $1,310 Implemented
UD0117 # 03 Y:1984 03 1984 INSTALL STORM WINDOWS AND DOORS $18,493 $22,385 Implemented
UD0117 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,694 $0 Implemented
UD0117 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $548 $182 Implemented
KU0118 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,757 $500 Implemented
KU0118 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $883 $0 Implemented
KU0118 # 06 Y:1984 06 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $866 $0 Implemented
KU0118 # 07 Y:1984 07 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $463 $0 Implemented
KU0118 # 11 Y:1984 11 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $519 $200 Implemented
KU0118 # 12 Y:1984 12 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $325 $0 Implemented
OK0124 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $5,465 $650 Implemented
OK0124 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $30 Implemented
OK0124 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,730 $256 Implemented
OK0124 # 04 Y:1984 04 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $56 $0 Implemented
OK0124 # 05 Y:1984 05 1984 RECOVER WASTE HEAT FROM EQUIPMENT $218 $516 Implemented
OK0124 # 06 Y:1984 06 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $64 $485 Implemented
OK0127 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $344 $434 Implemented
OK0127 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $744 $0 Implemented
OK0127 # 04 Y:1984 04 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $367 $0 Implemented
KU0114 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,440 $1,100 Implemented
KU0114 # 05 Y:1984 05 1984 AIR CONDITION ONLY SPACE NECESSARY $1,407 $263 Implemented
UD0116 # 02 Y:1984 02 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,320 $3,000 Implemented