Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,546
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NV0148 # 04 Y:2000 | 04 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $704 | $0 | Implemented |
OK0590 # 03 Y:2000 | 03 | 2000 | BURN WASTE OIL FOR HEAT | $2,892 | $3,490 | Implemented |
OK0590 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,743 | $1,613 | Implemented |
ME0284 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,586 | $8,987 | Implemented |
ME0284 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,090 | $15,253 | Implemented |
BD0153 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,555 | $13,420 | Implemented |
BD0153 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $3,918 | $930 | Implemented |
BD0153 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,648 | $1,125 | Implemented |
BD0153 # 04 Y:2000 | 04 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $826 | $0 | Implemented |
BD0153 # 07 Y:2000 | 07 | 2000 | MODIFY MATERIAL APPLICATION METHODS | $1,171 | $1,500 | Implemented |
ME0280 # 01 Y:1999 | 01 | 1999 | INSTALL SENSORS TO DETECT DEFECTS | $243,000 | $20,108 | Implemented |
ME0280 # 02 Y:1999 | 02 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $105,600 | $6,000 | Implemented |
ME0280 # 03 Y:1999 | 03 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $15,000 | $0 | Implemented |
ME0280 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,958 | $28,528 | Implemented |
ME0280 # 06 Y:1999 | 06 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,402 | $4,940 | Implemented |
ME0280 # 08 Y:1999 | 08 | 1999 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,092 | $1,240 | Implemented |
ME0280 # 09 Y:1999 | 09 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $55,341 | $30,500 | Implemented |
TN0673 # 01 Y:2000 | 01 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,075 | $2,610 | Implemented |
TN0673 # 06 Y:2000 | 06 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $160 | $0 | Implemented |
AR0181 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $368 | $340 | Implemented |
AR0181 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,363 | $500 | Implemented |
AR0181 # 04 Y:2000 | 04 | 2000 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $23,800 | $16,000 | Implemented |
AM0360 # 01 Y:1999 | 01 | 1999 | USE RADIANT HEATER FOR SPOT HEATING | $13,800 | $12,800 | Implemented |
AM0360 # 02 Y:1999 | 02 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,360 | $0 | Implemented |
AM0360 # 03 Y:1999 | 03 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,140 | $0 | Implemented |