Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,546
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0155 # 16 Y:1985 | 16 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $150 | $0 | Implemented |
GT0248 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $722 | $581 | Implemented |
GT0248 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,090 | $222 | Implemented |
GT0248 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $937 | $125 | Implemented |
GT0248 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,875 | $500 | Implemented |
GT0248 # 06 Y:1985 | 06 | 1985 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $97,891 | $0 | Implemented |
MA0016 # 01 Y:1985 | 01 | 1985 | AIR CONDITION ONLY SPACE NECESSARY | $7,772 | $5,000 | Implemented |
MA0016 # 02 Y:1985 | 02 | 1985 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,480 | $3,178 | Implemented |
MA0016 # 03 Y:1985 | 03 | 1985 | INSTALL SET-BACK TIMERS | $453 | $101 | Implemented |
ST0014 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,127 | $2,011 | Implemented |
ST0014 # 02 Y:1985 | 02 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,934 | $500 | Implemented |
ST0014 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $722 | $85 | Implemented |
ST0014 # 04 Y:1985 | 04 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,504 | $537 | Implemented |
ST0014 # 05 Y:1985 | 05 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $3,141 | $6,344 | Implemented |
ST0014 # 06 Y:1985 | 06 | 1985 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,403 | $6,000 | Implemented |
ST0014 # 07 Y:1985 | 07 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $527 | $0 | Implemented |
ST0014 # 08 Y:1985 | 08 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,305 | $200 | Implemented |
ST0014 # 10 Y:1985 | 10 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $14,474 | $50 | Implemented |
MA0012 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,078 | $100 | Implemented |
MA0012 # 02 Y:1984 | 02 | 1984 | INSULATE BARE EQUIPMENT | $40 | $25 | Implemented |
MA0012 # 03 Y:1984 | 03 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $422 | $550 | Implemented |
KU0142 # 01 Y:1984 | 01 | 1984 | AIR CONDITION ONLY SPACE NECESSARY | $94,910 | $8,142 | Implemented |
KU0142 # 02 Y:1984 | 02 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $43,246 | $0 | Implemented |
KU0142 # 03 Y:1984 | 03 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $4,724 | $0 | Implemented |
KU0142 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,695 | $2,171 | Implemented |