IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0266 # 02 Y:2025 02 2025 USE RADIANT HEATER FOR SPOT HEATING $8,217 $13,000 n/a
UU0266 # 07 Y:2025 07 2025 OPTIMIZE PLANT POWER FACTOR $8,550 $22,000 n/a
UU0266 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $633 $543 n/a
UU0266 # 05 Y:2025 05 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,730 $6,960 n/a
UU0266 # 01 Y:2025 01 2025 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,681 $22,500 n/a
UU0266 # 04 Y:2025 04 2025 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,500 $38,200 n/a
UU0266 # 03 Y:2025 03 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $52,801 $18,500 n/a
UU0100 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,510 $830 Not Implemented
UU0100 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,720 $10,000 Not Implemented
UU0100 # 06 Y:2006 06 2006 OPTIMIZE PLANT POWER FACTOR $4,280 $4,140 Not Implemented
UU0100 # 05 Y:2006 05 2006 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $15,000 $10,000 Not Implemented
UU0100 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $740 Not Implemented
UU0100 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,490 $165 Not Implemented
UU0096 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $330 Not Implemented
UU0096 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,320 $1,950 Not Implemented
UU0096 # 05 Y:2005 05 2005 RECOVER AND REUSE WASTE MATERIAL $9,000 $0 Not Implemented
UU0096 # 03 Y:2005 03 2005 USE PHOTOCELL CONTROLS $2,530 $2,040 Not Implemented
UU0096 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,320 $5,000 Not Implemented
UU0058 # 01 Y:2004 01 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $54,124 $150,000 Not Implemented
UU0058 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,398 $308 Not Implemented
UU0058 # 08 Y:2004 08 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $584 $0 Not Implemented
UU0058 # 07 Y:2004 07 2004 COMBINE UTILITY METERS $10,270 $0 Implemented
UU0058 # 02 Y:2004 02 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $21,233 $78,000 Not Implemented
UU0058 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $6,081 $5,369 Not Implemented
UU0058 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,714 $1,010 Implemented