IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,509

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0225 # 09 Y:2003 09 2003 USE SYNTHETIC LUBRICANT $240 $350 Not Implemented
BD0225 # 10 Y:2003 10 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $224 $1,000 Not Implemented
BD0225 # 11 Y:2003 11 2003 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $7,920 $2,200 Not Implemented
BD0225 # 12 Y:2003 12 2003 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $3,180 $500 Not Implemented
BD0225 # 13 Y:2003 13 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $400 $120 Not Implemented
BD0225 # 14 Y:2003 14 2003 USE POWER DURING OFF-PEAK PERIODS $3,393 $4,000 Not Implemented
BD0225 # 15 Y:2003 15 2003 AUTOMATE PAYROLL SYSTEM $2,080 $2,500 Not Implemented
BD0225 # 16 Y:2003 16 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $900 $300 Not Implemented
SU0153 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,642 $93,355 Implemented
SU0153 # 02 Y:2003 02 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $42,094 $93,819 Not Implemented
SU0153 # 03 Y:2003 03 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $30,876 $11,602 Implemented
SU0153 # 04 Y:2003 04 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $12,993 $7,176 Not Implemented
SU0153 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,229 $438 Implemented
SU0153 # 06 Y:2003 06 2003 OPTIMIZE PLANT POWER FACTOR $5,043 $16,501 Implemented
SU0153 # 07 Y:2003 07 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,900 $16,700 Implemented
SU0153 # 08 Y:2003 08 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,098 $12,105 Not Implemented
SU0153 # 09 Y:2003 09 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,467 $163 Implemented
SU0153 # 10 Y:2003 10 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $882 $249 Not Implemented
TA0043 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,980 $0 Implemented
TA0043 # 02 Y:2002 02 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,735 $0 Implemented
TA0043 # 03 Y:2002 03 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,390 $0 Implemented
TA0043 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $670 $0 Implemented
TA0043 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $140 $75 Not Implemented
TA0043 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $101 $163 Not Implemented
SD0306 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,205 $23,000 Not Implemented