Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,509
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0021 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $474 | $400 | Implemented |
IC0021 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $129 | $550 | Not Implemented |
IC0021 # 04 Y:2001 | 04 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,684 | $0 | Not Implemented |
IC0021 # 05 Y:2001 | 05 | 2001 | AUTOMATE PAYROLL SYSTEM | $2,350 | $1,900 | Not Implemented |
SF0227 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,362 | $0 | Implemented |
SF0227 # 02 Y:2001 | 02 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $3,747 | $1,200 | Implemented |
SF0227 # 03 Y:2001 | 03 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $44,975 | $17,844 | Not Implemented |
SF0227 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $4,298 | Implemented |
SF0227 # 05 Y:2001 | 05 | 2001 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,077 | $52 | Implemented |
SF0227 # 06 Y:2001 | 06 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $807,300 | $190,000 | Implemented |
SF0227 # 07 Y:2001 | 07 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $24,960 | $30,230 | Implemented |
MI0023 # 01 Y:2001 | 01 | 2001 | METER WASTE WATER | $2,223 | $3,650 | Not Implemented |
MI0023 # 02 Y:2001 | 02 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $69,120 | $150,000 | Not Implemented |
MI0023 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,387 | $3 | Not Implemented |
MI0023 # 04 Y:2001 | 04 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $11,384 | $143 | Not Implemented |
MI0023 # 05 Y:2001 | 05 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,932 | $2 | Not Implemented |
MI0023 # 06 Y:2001 | 06 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,432 | $6 | Not Implemented |
MI0023 # 07 Y:2001 | 07 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,831 | $1,879 | Not Implemented |
CO0493 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,290 | $23,430 | Implemented |
CO0493 # 02 Y:2001 | 02 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,500 | $21,650 | Not Implemented |
CO0493 # 03 Y:2001 | 03 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,500 | $6,270 | Implemented |
CO0493 # 04 Y:2001 | 04 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,960 | $6,500 | Implemented |
CO0493 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,290 | $360 | Implemented |
CO0493 # 06 Y:2001 | 06 | 2001 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $7,270 | $8,240 | Not Implemented |
WI0407 # 01 Y:2001 | 01 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $26,600 | $0 | n/a |