IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,493

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0002 # 06 Y:2001 06 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $225 $90 Implemented
CO0479 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,970 $17,900 n/a
CO0479 # 02 Y:2000 02 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,190 $2,500 Implemented
CO0479 # 03 Y:2000 03 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,180 $12,990 Not Implemented
CO0479 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $110 Implemented
CO0479 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $390 $60 Not Implemented
CO0479 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $179,700 $0 Not Implemented
GT0706 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $400 $0 n/a
GT0706 # 02 Y:2000 02 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,875 $0 n/a
GT0706 # 03 Y:2000 03 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,695 $0 n/a
GT0706 # 04 Y:2000 04 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $28,255 $13,250 n/a
GT0706 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,224 $3,360 n/a
GT0706 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,130 $2,890 n/a
GT0706 # 07 Y:2000 07 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,080 $6,100 n/a
AM0382 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $10,200 $11,290 Not Implemented
AM0382 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,860 $2,000 Implemented
AM0382 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,030 $0 Implemented
AM0382 # 04 Y:2000 04 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,440 $780 Not Implemented
AM0382 # 05 Y:2000 05 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,020 $5,500 Implemented
AM0382 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $180 Not Implemented
BD0173 # 01 Y:2000 01 2000 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $31,116 $16,000 n/a
BD0173 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,742 $600 Implemented
BD0173 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,471 $1,000 Not Implemented
BD0173 # 04 Y:2000 04 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,576 $10,000 Not Implemented
BD0173 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $1,220 $1,050 Not Implemented