IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,509

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0709 # 01 Y:2001 01 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,318 $500 Not Implemented
GT0709 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,200 $250 Not Implemented
GT0709 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,340 $1,150 Not Implemented
GT0709 # 04 Y:2001 04 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,241 $850 Not Implemented
GT0709 # 05 Y:2001 05 2001 USE POWER DURING OFF-PEAK PERIODS $30,130 $0 Not Implemented
GT0709 # 06 Y:2001 06 2001 IMPROVE SPACE COMFORT CONDITIONING $205,424 $21,200 Not Implemented
GT0709 # 07 Y:2001 07 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,125 $1,000 Not Implemented
GT0709 # 08 Y:2001 08 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,850 $2,000 Not Implemented
GT0709 # 09 Y:2001 09 2001 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $360,000 $1,600,000 Not Implemented
GT0709 # 10 Y:2001 10 2001 METER WASTE WATER $8,955 $6,500 Not Implemented
GT0709 # 11 Y:2001 11 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,468 $29,375 Not Implemented
TA0002 # 01 Y:2001 01 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $9,338 $450 Not Implemented
TA0002 # 02 Y:2001 02 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,612 $-8,612 Implemented
TA0002 # 03 Y:2001 03 2001 PAY BILLS ON TIME TO AVOID LATE FEES $2,563 $0 Implemented
TA0002 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,094 $0 Implemented
TA0002 # 05 Y:2001 05 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $432 $454 Not Implemented
TA0002 # 06 Y:2001 06 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $225 $90 Implemented
CO0479 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,970 $17,900 n/a
CO0479 # 02 Y:2000 02 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,190 $2,500 Implemented
CO0479 # 03 Y:2000 03 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,180 $12,990 Not Implemented
CO0479 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $110 Implemented
CO0479 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $390 $60 Not Implemented
CO0479 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $179,700 $0 Not Implemented
GT0706 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $400 $0 n/a
GT0706 # 02 Y:2000 02 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,875 $0 n/a