IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,493

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0252 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,693 $59,800 Not Implemented
AS0252 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,590 $12,314 Not Implemented
AS0252 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,570 $220 Implemented
AS0252 # 05 Y:1999 05 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $515 $80 Implemented
AS0252 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,018 $80 Not Implemented
AS0252 # 07 Y:1999 07 1999 PAY BILLS ON TIME TO AVOID LATE FEES $12,037 $80 Not Implemented
DS0142 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,613 $1,613 Not Implemented
DS0142 # 02 Y:1999 02 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $676 $400 Not Implemented
DS0142 # 03 Y:1999 03 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,900 $1,000 Not Implemented
DS0142 # 04 Y:1999 04 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $721 $1,811 Not Implemented
AS0250 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $689 $696 Not Implemented
AS0250 # 02 Y:1999 02 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,274 $1,040 Not Implemented
AS0250 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,741 $120 Implemented
AS0250 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,394 $1,000 Implemented
AS0250 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $720 $30 Not Implemented
AS0250 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $14,688 $12,256 Not Implemented
AS0250 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,967 $180 Not Implemented
TP0002 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $16,692 $23,000 Implemented
TP0002 # 02 Y:1999 02 1999 INSTALL SKYLIGHTS $7,366 $20,190 Not Implemented
TP0002 # 03 Y:1999 03 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,464 $6,352 Not Implemented
TP0002 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,178 $1,000 Implemented
TP0002 # 05 Y:1999 05 1999 PAY UTILITY BILLS ON TIME $1,514 $0 Implemented
TP0002 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $408 $1,729 Not Implemented
TP0002 # 07 Y:1999 07 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $880 $0 Implemented
TP0002 # 08 Y:1999 08 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $342 $0 Implemented