Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,509
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MO0006 # 03 Y:1990 | 03 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $698 | $0 | Implemented |
KU0317 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $862 | $206 | Implemented |
KU0317 # 02 Y:1990 | 02 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,455 | $240 | Implemented |
KU0317 # 03 Y:1990 | 03 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,311 | $1,400 | Implemented |
KU0317 # 04 Y:1990 | 04 | 1990 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $453 | $0 | Not Implemented |
KU0317 # 05 Y:1990 | 05 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $571 | $950 | Not Implemented |
AS0010 # 01 Y:1990 | 01 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,459 | $0 | Implemented |
AS0010 # 02 Y:1990 | 02 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $591 | $758 | Implemented |
AS0010 # 03 Y:1990 | 03 | 1990 | INSULATE BARE EQUIPMENT | $3,149 | $261 | Implemented |
AS0010 # 04 Y:1990 | 04 | 1990 | INSULATE BARE EQUIPMENT | $7,665 | $2,474 | Implemented |
AS0010 # 05 Y:1990 | 05 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,125 | $2,587 | Implemented |
AS0010 # 06 Y:1990 | 06 | 1990 | KEEP LAMPS AND REFLECTORS CLEAN | $17,065 | $13,365 | Not Implemented |
AS0010 # 07 Y:1990 | 07 | 1990 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $16,359 | $6,000 | Implemented |
AS0010 # 08 Y:1990 | 08 | 1990 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,640 | $1,000 | Not Implemented |
MA0182 # 01 Y:1990 | 01 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $5,921 | $116,600 | Implemented |
MA0182 # 02 Y:1990 | 02 | 1990 | INSTALL SET-BACK TIMERS | $368 | $440 | Implemented |
MA0182 # 03 Y:1990 | 03 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $678 | $336 | Implemented |
MA0182 # 04 Y:1990 | 04 | 1990 | INSULATE BARE EQUIPMENT | $644 | $1,540 | Not Implemented |
MA0182 # 05 Y:1990 | 05 | 1990 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $471 | $675 | Implemented |
MA0182 # 06 Y:1990 | 06 | 1990 | REDUCE VENTILATION AIR | $2,509 | $500 | Not Implemented |
GT0408 # 01 Y:1990 | 01 | 1990 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $6,500 | $5,860 | Not Implemented |
GT0408 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,900 | $3,771 | Implemented |
GT0408 # 03 Y:1990 | 03 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $810 | $0 | Implemented |
GT0408 # 04 Y:1990 | 04 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $37 | $0 | Not Implemented |
GT0408 # 05 Y:1990 | 05 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $32 | $57 | Not Implemented |