IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

265

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0301 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,087 $5,000 Implemented
MZ0301 # 04 Y:2020 04 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,146 $7,360 Not Implemented
MZ0301 # 10 Y:2020 10 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,307 $4,100 Implemented
MZ0301 # 08 Y:2020 08 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $304 $52 Implemented
MZ0301 # 05 Y:2020 05 2020 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,963 $4,300 Not Implemented
MZ0301 # 09 Y:2020 09 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $673 $405 Implemented
MZ0301 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,251 $400 Not Implemented
MZ0295 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $4,700 $3,360 Implemented
MZ0295 # 07 Y:2020 07 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,773 $1,390 Not Implemented
MZ0295 # 10 Y:2020 10 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,456 $9,000 Not Implemented
MZ0295 # 09 Y:2020 09 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $675 $322 Implemented
MZ0295 # 03 Y:2020 03 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $52,781 $20,000 Not Implemented
MZ0295 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,658 $3,500 Implemented
MZ0295 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,280 $550 Implemented
MZ0295 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,272 $240 Implemented
MZ0295 # 08 Y:2020 08 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,561 $360 Implemented
MZ0295 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,599 $34,694 Implemented
MZ0282 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,849 $320 Not Implemented
MZ0282 # 11 Y:2019 11 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,699 $18,720 Not Implemented
MZ0282 # 01 Y:2019 01 2019 INSTALL SPECTRAL REFLECTORS / DELAMP $586 $472 Implemented
MZ0282 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,909 $680 Implemented
MZ0282 # 05 Y:2019 05 2019 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $287,984 $1,030,500 Not Implemented
MZ0282 # 07 Y:2019 07 2019 RECOVER WASTE HEAT FROM EQUIPMENT $7,721 $7,200 Implemented
MZ0282 # 06 Y:2019 06 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,100 $14,000 Not Implemented
MZ0282 # 08 Y:2019 08 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $53,310 $16,200 Implemented