IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,493

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
PV0006 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $175 $0 Not Implemented
PV0006 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $85 $0 Not Implemented
PV0003 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $478 $0 Not Implemented
PV0003 # 02 Y:1985 02 1985 USE RADIANT HEATER FOR SPOT HEATING $253 $1,650 Not Implemented
ST0032 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $514 $64 Implemented
ST0032 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $72 $42 Not Implemented
ST0032 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,640 $688 Not Implemented
ST0032 # 04 Y:1985 04 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $890 $1,900 Implemented
ST0032 # 05 Y:1985 05 1985 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,974 $900 Not Implemented
ST0032 # 06 Y:1985 06 1985 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $2,416 $5,000 Not Implemented
ST0032 # 07 Y:1985 07 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $305 $0 Not Implemented
ST0032 # 08 Y:1985 08 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $380 $1,140 Not Implemented
ST0032 # 09 Y:1985 09 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $503 $380 Not Implemented
TN0248 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,966 $375 Implemented
TN0248 # 02 Y:1985 02 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,354 $4,000 Implemented
TN0248 # 03 Y:1985 03 1985 COVER OPEN TANKS $1,628 $800 Implemented
TN0248 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $1,044 $750 Implemented
TN0248 # 05 Y:1985 05 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $354 $399 Not Implemented
TN0248 # 06 Y:1985 06 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $967 $0 Implemented
TN0248 # 07 Y:1985 07 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $457 $500 Implemented
UD0158 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,705 $1,260 Implemented
UD0158 # 02 Y:1985 02 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $434 $280 Implemented
UD0158 # 03 Y:1985 03 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,850 $18,000 Not Implemented
UD0158 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $240 Implemented
KU0155 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,743 $948 Implemented