IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,509

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0044 # 07 Y:1985 07 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $496 $1,100 Not Implemented
ST0044 # 08 Y:1985 08 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $221 $390 Not Implemented
ST0044 # 09 Y:1985 09 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $247 $110 Not Implemented
ST0044 # 10 Y:1985 10 1985 INSTALL STORM WINDOWS AND DOORS $225 $400 Not Implemented
ST0044 # 11 Y:1985 11 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $294 $182 Not Implemented
ST0044 # 12 Y:1985 12 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $609 $200 Not Implemented
OK0179 # 01 Y:1985 01 1985 OPTIMIZE PLANT POWER FACTOR $1,296 $3,847 Not Implemented
OK0179 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $271 $600 Implemented
OK0179 # 03 Y:1985 03 1985 USE RADIANT HEATER FOR SPOT HEATING $12,890 $4,700 Implemented
OK0179 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $215 $248 Implemented
PV0005 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $437 $17 Not Implemented
PV0005 # 02 Y:1985 02 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,834 $0 Not Implemented
PV0006 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $175 $0 Not Implemented
PV0006 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $85 $0 Not Implemented
UD0172 # 01 Y:1985 01 1985 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,203 $150 Implemented
UD0172 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,225 $50 Implemented
UD0172 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $123 Implemented
UD0172 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $546 $0 Implemented
PV0003 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $478 $0 Not Implemented
PV0003 # 02 Y:1985 02 1985 USE RADIANT HEATER FOR SPOT HEATING $253 $1,650 Not Implemented
ST0032 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $514 $64 Implemented
ST0032 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $72 $42 Not Implemented
ST0032 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,640 $688 Not Implemented
ST0032 # 04 Y:1985 04 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $890 $1,900 Implemented
ST0032 # 05 Y:1985 05 1985 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,974 $900 Not Implemented