Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,493
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0155 # 02 Y:1985 | 02 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,311 | $278 | Implemented |
KU0155 # 03 Y:1985 | 03 | 1985 | IMPROVE LUBRICATION PRACTICES | $2,931 | $0 | Implemented |
KU0155 # 04 Y:1985 | 04 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,855 | $0 | Not Implemented |
KU0155 # 05 Y:1985 | 05 | 1985 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,055 | $20 | Not Implemented |
KU0155 # 06 Y:1985 | 06 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $851 | $300 | Implemented |
KU0155 # 07 Y:1985 | 07 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $327 | $50 | Not Implemented |
KU0155 # 08 Y:1985 | 08 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $305 | $20 | Not Implemented |
KU0155 # 09 Y:1985 | 09 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,418 | $0 | Implemented |
KU0155 # 10 Y:1985 | 10 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $1,280 | $975 | Not Implemented |
KU0155 # 11 Y:1985 | 11 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $827 | $300 | Implemented |
KU0155 # 12 Y:1985 | 12 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23 | $0 | Implemented |
KU0155 # 13 Y:1985 | 13 | 1985 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $434 | $0 | Not Implemented |
KU0155 # 14 Y:1985 | 14 | 1985 | USE RADIANT HEATER FOR SPOT HEATING | $112 | $25 | Not Implemented |
KU0155 # 15 Y:1985 | 15 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $393 | $0 | Implemented |
KU0155 # 16 Y:1985 | 16 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $150 | $0 | Implemented |
GT0248 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $722 | $581 | Implemented |
GT0248 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,090 | $222 | Implemented |
GT0248 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $937 | $125 | Implemented |
GT0248 # 04 Y:1985 | 04 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,830 | $7,000 | Not Implemented |
GT0248 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,875 | $500 | Implemented |
GT0248 # 06 Y:1985 | 06 | 1985 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $97,891 | $0 | Implemented |
GT0248 # 07 Y:1985 | 07 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,990 | $12,500 | Not Implemented |
PV0001 # 01 Y:1985 | 01 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,125 | $1,659 | Not Implemented |
PV0001 # 02 Y:1985 | 02 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $499 | $666 | Not Implemented |
PV0001 # 03 Y:1985 | 03 | 1985 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,276 | $1,271 | Not Implemented |