Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,493
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0142 # 12 Y:1984 | 12 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $2,678 | $3,800 | Not Implemented |
KU0142 # 13 Y:1984 | 13 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,360 | $3,500 | Implemented |
KU0142 # 14 Y:1984 | 14 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,883 | $75 | Implemented |
KU0142 # 15 Y:1984 | 15 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,590 | $0 | Not Implemented |
KU0142 # 16 Y:1984 | 16 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,606 | $0 | Implemented |
KU0142 # 17 Y:1984 | 17 | 1984 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $292 | $400 | Not Implemented |
KU0142 # 18 Y:1984 | 18 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $108 | $62 | Not Implemented |
KU0142 # 19 Y:1984 | 19 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $506 | $0 | Implemented |
TN0225 # 01 Y:1984 | 01 | 1984 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,090 | $13,000 | Not Implemented |
TN0225 # 02 Y:1984 | 02 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,768 | $95 | Not Implemented |
TN0225 # 03 Y:1984 | 03 | 1984 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $6,670 | $0 | Not Implemented |
TN0225 # 04 Y:1984 | 04 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,236 | $500 | Not Implemented |
TN0225 # 05 Y:1984 | 05 | 1984 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $18,012 | $10,000 | Not Implemented |
TN0225 # 06 Y:1984 | 06 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,056 | $0 | Not Implemented |
TN0225 # 07 Y:1984 | 07 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,159 | $3,500 | Not Implemented |
GT0235 # 01 Y:1984 | 01 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,170 | $250 | Implemented |
GT0235 # 02 Y:1984 | 02 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $136 | $473 | Implemented |
GT0235 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $840 | $1,100 | Implemented |
ST0004 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $599 | $537 | Implemented |
ST0004 # 02 Y:1984 | 02 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,185 | $200 | Implemented |
ST0004 # 03 Y:1984 | 03 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,058 | $40 | Implemented |
ST0004 # 04 Y:1984 | 04 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $583 | $1,480 | Implemented |
ST0004 # 05 Y:1984 | 05 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $990 | $960 | Implemented |
ST0004 # 06 Y:1984 | 06 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $4,135 | $845 | Implemented |
CO0006 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $350 | $300 | Implemented |