IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0352 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,554 $4,768 Not Implemented
LE0352 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,631 $1,000 Not Implemented
LE0352 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,414 $2,750 Implemented
LE0352 # 06 Y:2013 06 2013 CLEAN CONDENSER TUBES $2,216 $12,000 Not Implemented
LE0352 # 07 Y:2013 07 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,176 $1,000 Not Implemented
LE0344 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,461 $11,250 Not Implemented
LE0344 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $3,730 $10,374 Not Implemented
LE0344 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,467 $6,930 Not Implemented
LE0344 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,478 $9,168 Not Implemented
LE0344 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,850 $1,000 Not Implemented
LE0344 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,371 $375 Implemented
LE0344 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $653 $40 Implemented
LE0344 # 08 Y:2012 08 2012 INSTALL TIMERS AND/OR THERMOSTATS $16,963 $150 Not Implemented
LE0344 # 09 Y:2012 09 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,214 $400 Not Implemented
LE0344 # 10 Y:2012 10 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,002 $1,500 Not Implemented
LE0337 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,631 $28,000 Not Implemented
LE0337 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,684 $1,000 Not Implemented
LE0337 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $11,678 $19,140 Not Implemented
LE0337 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,020 $1,562 Not Implemented
LE0337 # 05 Y:2012 05 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,107 $2,500 Not Implemented
WV0413 # 01 Y:2010 01 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $108,743 $89,900 Not Implemented
WV0413 # 02 Y:2010 02 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $89,967 $129,542 Not Implemented
WV0413 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $77,291 $154,121 Implemented
WV0413 # 04 Y:2010 04 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $59,435 $55,000 Implemented
WV0413 # 05 Y:2010 05 2010 COVER OPEN TANKS $41,697 $9,404 Not Implemented