Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,509
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0470 # 02 Y:2013 | 02 | 2013 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $16,582 | $68,000 | Implemented |
WV0470 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,807 | $20,200 | Not Implemented |
WV0470 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,666 | $1,080 | Implemented |
WV0470 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,422 | $13,020 | Not Implemented |
WV0470 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,069 | $2,050 | Implemented |
WV0470 # 07 Y:2013 | 07 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,736 | $1,700 | Implemented |
WV0470 # 08 Y:2013 | 08 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,892 | $3,300 | Not Implemented |
WV0470 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $620 | $105 | Implemented |
WV0470 # 10 Y:2013 | 10 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $152 | $380 | Not Implemented |
IP0013 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,266 | $0 | Implemented |
IP0013 # 02 Y:2013 | 02 | 2013 | APPLY FOR INVESTMENT INCENTIVES | $4,197 | $0 | Not Implemented |
IP0013 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $907 | $0 | Not Implemented |
IP0013 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $192 | $0 | Implemented |
IP0013 # 05 Y:2013 | 05 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,079 | $1,148 | Not Implemented |
IP0013 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $4,447 | $2,744 | Implemented |
IP0013 # 07 Y:2013 | 07 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,251 | $4,863 | Not Implemented |
IP0013 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $633 | $1,535 | Not Implemented |
IP0013 # 09 Y:2013 | 09 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,354 | $2,340 | Implemented |
IP0013 # 10 Y:2013 | 10 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,491 | $15,502 | Implemented |
MI0240 # 01 Y:2013 | 01 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $15,757 | $91,089 | Implemented |
MI0240 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $2,089 | $4,173 | Implemented |
MI0240 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $1,829 | $4,802 | Implemented |
MI0240 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,769 | $1,660 | Implemented |
MI0240 # 05 Y:2013 | 05 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $544 | $208 | Implemented |
MI0240 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,605 | $80 | Not Implemented |