IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,509

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0593 # 01 Y:2012 01 2012 USE MORE EFFICIENT ADHESIVE APPLICATORS $72,379 $43,800 Not Implemented
OR0593 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,751 $4,751 Implemented
OR0593 # 03 Y:2012 03 2012 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $2,514 $900 Not Implemented
OR0593 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $930 $2,250 Not Implemented
OR0593 # 05 Y:2012 05 2012 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,590 $34,684 Not Implemented
UA3022 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $54,140 $50 Not Implemented
UA3022 # 02 Y:2012 02 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $31,511 $15,063 Not Implemented
UA3022 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $12,180 $50 Not Implemented
UA3022 # 04 Y:2012 04 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $64,995 $90,750 Not Implemented
IA0486 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $904 $2,721 Not Implemented
IA0486 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $415 $350 Implemented
IA0486 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $362 $420 Implemented
IA0486 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $462 $448 Implemented
IA0486 # 05 Y:2012 05 2012 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,985 $8,186 Implemented
CO0659 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,680 $25,960 Implemented
CO0659 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $500 Implemented
CO0659 # 03 Y:2012 03 2012 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $21,530 $6,400 Not Implemented
CO0659 # 04 Y:2012 04 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,180 $500 Not Implemented
CO0659 # 05 Y:2012 05 2012 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,570 $0 Implemented
CO0659 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $380 $1,240 Not Implemented
AM0614 # 01 Y:2012 01 2012 OPTIMIZE PLANT POWER FACTOR $12,400 $24,400 Implemented
AM0614 # 02 Y:2012 02 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $51,500 $1,500 Implemented
AM0614 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,300 $15 Implemented
AM0614 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,800 $700 Implemented
AM0614 # 05 Y:2012 05 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,500 $5,370 Implemented