IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

291

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0533 # 02 Y:1997 02 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,468 $200 Implemented
UD0533 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,455 $2,564 Implemented
UD0533 # 04 Y:1997 04 1997 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $352 $50 Implemented
UD0533 # 05 Y:1997 05 1997 UPGRADE CONTROLS ON COMPRESSORS $553 $750 Implemented
UD0533 # 06 Y:1997 06 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,574 $20,000 Not Implemented
UD0533 # 07 Y:1997 07 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $37,000 $36,000 Implemented
UD0533 # 08 Y:1997 08 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $101 $50 Implemented
UD0533 # 09 Y:1997 09 1997 MINIMIZE WATER USAGE $125 $60 Not Implemented
UD0532 # 01 Y:1997 01 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,469 $0 Implemented
UD0532 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,083 $15,018 Implemented
UD0532 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,422 $637 Not Implemented
UD0532 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $123 $2,000 Implemented
UD0532 # 05 Y:1997 05 1997 USE OTHER WASTE CONCENTRATION METHODS $580 $0 Implemented
UD0532 # 06 Y:1997 06 1997 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $6,335 $5,000 Implemented
UD0532 # 07 Y:1997 07 1997 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $10,100 $20,000 Not Implemented
UD0532 # 08 Y:1997 08 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $2,508 $4,880 Implemented
UD0529 # 01 Y:1997 01 1997 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $4,259 $0 Implemented
UD0529 # 02 Y:1997 02 1997 COMBINE UTILITY METERS $1,939 $3,357 Implemented
UD0529 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $92 $0 Not Implemented
UD0529 # 04 Y:1997 04 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $551 $500 Implemented
UD0529 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $459 $1,290 Not Implemented
UD0529 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,396 $200 Implemented
UD0527 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,177 $200 Implemented
UD0527 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,800 $3,259 Not Implemented
UD0527 # 03 Y:1997 03 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,740 $3,000 Not Implemented