IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,493

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0255 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,025 $32,224 Not Implemented
SU0255 # 11 Y:2007 11 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $269 $727 Not Implemented
SU0255 # 12 Y:2007 12 2007 OPTIMIZE PLANT POWER FACTOR $563 $3,344 Not Implemented
MZ0004 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,138 $2,230 Implemented
MZ0004 # 02 Y:2007 02 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $18,457 $3,412 Not Implemented
MZ0004 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,707 $1,300 Not Implemented
MZ0004 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $184 $150 Implemented
MZ0004 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,950 $24,700 Not Implemented
MZ0004 # 06 Y:2007 06 2007 DISCONNECT BALLASTS $19,720 $1,050 Not Implemented
MZ0004 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $6,900 $2,950 Not Implemented
MZ0004 # 08 Y:2007 08 2007 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $56,125 $0 Not Implemented
MZ0004 # 09 Y:2007 09 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,600 $0 Implemented
MS0316 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,634 $27,365 Not Implemented
MS0316 # 02 Y:2007 02 2007 COMBINE UTILITY METERS $15,244 $0 Implemented
MS0316 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,294 $247 Implemented
MS0316 # 04 Y:2007 04 2007 PURCHASE EQUIPMENT INSTEAD OF LEASING $1,523 $1,575 Implemented
MS0316 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $545 $5,264 Not Implemented
OK0744 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,427 $8,720 Not Implemented
OK0744 # 02 Y:2007 02 2007 USE RADIANT HEATER FOR SPOT HEATING $34,603 $3,729 Not Implemented
OK0744 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,080 $360 Not Implemented
OK0744 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,247 $2,398 Not Implemented
OK0744 # 05 Y:2007 05 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $800 $0 Not Implemented
MS0313 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,342 $27,930 Not Implemented
MS0313 # 02 Y:2007 02 2007 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $20,700 $6,500 Not Implemented
MS0313 # 03 Y:2007 03 2007 USE OPTIMUM THICKNESS INSULATION $7,075 $2,156 Not Implemented