IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,509

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0071 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $491 $2,100 Implemented
MI0071 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $-1,062 $2,080 Implemented
MI0071 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $808 $2,527 Implemented
MI0071 # 04 Y:2004 04 2004 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $10,520 $2,160 Not Implemented
MI0071 # 05 Y:2004 05 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,800 $2,080 Implemented
MI0071 # 06 Y:2004 06 2004 REDUCE SCRAP PRODUCTION $76,111 $10,040 Not Implemented
MI0071 # 07 Y:2004 07 2004 EXPAND OPERATIONS INTO UNUSED SPACE $3,300 $30 Not Implemented
MI0071 # 08 Y:2004 08 2004 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $53,591 $28,480 Implemented
CO0537 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,550 $32,870 n/a
CO0537 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,830 $10,000 Not Implemented
CO0537 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,650 $260 Implemented
CO0537 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,219 $246 Not Implemented
CO0537 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,440 $1,800 Not Implemented
CO0537 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,370 $350 Implemented
CO0537 # 07 Y:2003 07 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,030 $120 Not Implemented
CO0537 # 08 Y:2003 08 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,540 $500 Implemented
MA0545 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,190 $0 Implemented
MA0545 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,737 $2,750 Implemented
MA0545 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $867 $340 Implemented
MA0545 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $601 $0 Implemented
MA0545 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $219 $0 Implemented
MA0545 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $199 $795 Implemented
UU0056 # 01 Y:2003 01 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $335 $1,600 Not Implemented
UU0056 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $325 $121 Implemented
UU0056 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $244 $58 Implemented