IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0522 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,680 $12,720 Not Implemented
LE0522 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,085 $4,448 Not Implemented
LE0522 # 05 Y:2022 05 2022 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,028 $7,400 Not Implemented
LE0522 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,261 $2,600 Not Implemented
LE0522 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,971 $1,200 Not Implemented
LE0522 # 02 Y:2022 02 2022 KEEP EQUIPMENT CLEAN $1,947 $1,161 Not Implemented
LE0522 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $335 $35 Not Implemented
LE0426 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $5,562 $2,000 Implemented
LE0426 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,376 $16,500 Not Implemented
LE0426 # 11 Y:2016 11 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,435 $12,000 Implemented
LE0426 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179 $780 Implemented
LE0426 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,579 $13,747 Implemented
LE0426 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $454 $1,300 Not Implemented
LE0426 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $3,070 $3,000 Not Implemented
LE0426 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,322 $780 Implemented
LE0426 # 03 Y:2016 03 2016 REDUCE VENTILATION AIR $102,120 $52,500 Not Implemented
LE0426 # 06 Y:2016 06 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,120 $35,000 Not Implemented
LE0426 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,840 $1,000 Implemented
LE0387 # 06 Y:2015 06 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $83,193 $86,300 Not Implemented
LE0387 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,919 $23,100 Not Implemented
LE0387 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,929 $14,175 Not Implemented
LE0387 # 01 Y:2015 01 2015 INSTALL OCCUPANCY SENSORS $1,375 $0 Not Implemented
LE0387 # 02 Y:2015 02 2015 ADJUST VENTS TO MINIMIZE ENERGY USE $163,566 $7,716 Not Implemented
LE0387 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,549 $1,000 Not Implemented
LE0387 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $67,292 $22,580 Not Implemented