Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0655 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $5,800 $5,000 Implemented
GT0655 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,677 $4,550 Implemented
GT0655 # 02 Y:1998 02 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,690 $1,250 Implemented
GT0655 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $6,576 $0 Implemented
GT0655 # 07 Y:1998 07 1998 CONVERT TO ELECTROSTATIC POWDER COATING $4,410 $5,400 Not Implemented
GT0655 # 03 Y:1998 03 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,582 $3,116 Not Implemented
GT0655 # 06 Y:1998 06 1998 CONVERT TO ELECTROSTATIC POWDER COATING $7,580 $4,800 Not Implemented
GT0655 # 08 Y:1998 08 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $3,500 $0 Not Implemented
OK0540 # 01 Y:1998 01 1998 MOVE PRODUCT USING MECHANICAL MEANS $5,006 $9,000 n/a
OK0540 # 06 Y:1998 06 1998 MOVE PRODUCT USING MECHANICAL MEANS $6,531 $0 n/a
OK0540 # 05 Y:1998 05 1998 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,226 $5,610 n/a
OK0540 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,180 $2,828 n/a
OK0540 # 03 Y:1998 03 1998 OPTIMIZE PLANT POWER FACTOR $2,129 $0 n/a
OK0540 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $783 $1,188 n/a
AM0333 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,300 $120 Implemented
AM0333 # 03 Y:1998 03 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $450 $0 Not Implemented
AM0333 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $370 Not Implemented
AM0333 # 05 Y:1998 05 1998 PAY UTILITY BILLS ON TIME $100 $0 Implemented
AM0333 # 01 Y:1998 01 1998 MODIFY STARTUP/SHUTDOWN TIMES $17,100 $0 Not Implemented
BD0124 # 10 Y:1998 10 1998 PAY BILLS ON TIME TO AVOID LATE FEES $263 $0 Not Implemented
BD0124 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $647 $250 Not Implemented
BD0124 # 09 Y:1998 09 1998 RECOVER AND REUSE WASTE MATERIAL $5,715 $2,500 Implemented
BD0124 # 06 Y:1998 06 1998 INSTALL OCCUPANCY SENSORS $459 $225 Not Implemented
BD0124 # 05 Y:1998 05 1998 USE SYNTHETIC LUBRICANT $641 $300 Not Implemented
BD0124 # 03 Y:1998 03 1998 UPGRADE CONTROLS ON COMPRESSORS $2,025 $0 Implemented