IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

200

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0625 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,851 $84 Implemented
OK0625 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,900 $360 Implemented
OK0625 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $376 $476 Implemented
OK0625 # 05 Y:2001 05 2001 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $868 $230 Implemented
OK0625 # 06 Y:2001 06 2001 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $39,782 $95,000 Implemented
OK0625 # 07 Y:2001 07 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $53,200 $30,400 Implemented
OK0625 # 04 Y:2001 04 2001 INSTALL SET-BACK TIMERS $2,642 $1,408 Not Implemented
IC0021 # 04 Y:2001 04 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,684 $0 Not Implemented
IC0021 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,966 $41,300 Not Implemented
IC0021 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $474 $400 Implemented
IC0021 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $129 $550 Not Implemented
IC0021 # 05 Y:2001 05 2001 AUTOMATE PAYROLL SYSTEM $2,350 $1,900 Not Implemented
SF0227 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,362 $0 Implemented
MI0023 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,387 $3 Not Implemented
MI0023 # 04 Y:2001 04 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $11,384 $143 Not Implemented
SF0227 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $4,298 Implemented
SF0227 # 05 Y:2001 05 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,077 $52 Implemented
SF0227 # 02 Y:2001 02 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,747 $1,200 Implemented
SF0227 # 06 Y:2001 06 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $807,300 $190,000 Implemented
MI0023 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,831 $1,879 Not Implemented
SF0227 # 03 Y:2001 03 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $44,975 $17,844 Not Implemented
MI0023 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $69,120 $150,000 Not Implemented
MI0023 # 06 Y:2001 06 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,432 $6 Not Implemented
MI0023 # 01 Y:2001 01 2001 METER WASTE WATER $2,223 $3,650 Not Implemented
MI0023 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $22,932 $2 Not Implemented