Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
200
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0625 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,851 | $84 | Implemented |
OK0625 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,900 | $360 | Implemented |
OK0625 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $376 | $476 | Implemented |
OK0625 # 05 Y:2001 | 05 | 2001 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $868 | $230 | Implemented |
OK0625 # 06 Y:2001 | 06 | 2001 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $39,782 | $95,000 | Implemented |
OK0625 # 07 Y:2001 | 07 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,200 | $30,400 | Implemented |
OK0625 # 04 Y:2001 | 04 | 2001 | INSTALL SET-BACK TIMERS | $2,642 | $1,408 | Not Implemented |
IC0021 # 04 Y:2001 | 04 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,684 | $0 | Not Implemented |
IC0021 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,966 | $41,300 | Not Implemented |
IC0021 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $474 | $400 | Implemented |
IC0021 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $129 | $550 | Not Implemented |
IC0021 # 05 Y:2001 | 05 | 2001 | AUTOMATE PAYROLL SYSTEM | $2,350 | $1,900 | Not Implemented |
SF0227 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,362 | $0 | Implemented |
MI0023 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,387 | $3 | Not Implemented |
MI0023 # 04 Y:2001 | 04 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $11,384 | $143 | Not Implemented |
SF0227 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $4,298 | Implemented |
SF0227 # 05 Y:2001 | 05 | 2001 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,077 | $52 | Implemented |
SF0227 # 02 Y:2001 | 02 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $3,747 | $1,200 | Implemented |
SF0227 # 06 Y:2001 | 06 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $807,300 | $190,000 | Implemented |
MI0023 # 07 Y:2001 | 07 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,831 | $1,879 | Not Implemented |
SF0227 # 03 Y:2001 | 03 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $44,975 | $17,844 | Not Implemented |
MI0023 # 02 Y:2001 | 02 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $69,120 | $150,000 | Not Implemented |
MI0023 # 06 Y:2001 | 06 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,432 | $6 | Not Implemented |
MI0023 # 01 Y:2001 | 01 | 2001 | METER WASTE WATER | $2,223 | $3,650 | Not Implemented |
MI0023 # 05 Y:2001 | 05 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,932 | $2 | Not Implemented |