Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
167
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0353 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $527 | $599 | Not Implemented |
IA0353 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $673 | $1,641 | Not Implemented |
IA0353 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $603 | $444 | Implemented |
IA0353 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $21 | $11 | Implemented |
IA0353 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $950 | $557 | Implemented |
IA0353 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $487 | $40 | Implemented |
IA0353 # 02 Y:2004 | 02 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $155 | $312 | Not Implemented |
IA0353 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,450 | $439 | Implemented |
UM0266 # 08 Y:2004 | 08 | 2004 | REVISE SMOKE CLEANUP FROM OPERATIONS | $1,614 | $500 | Implemented |
UM0266 # 04 Y:2004 | 04 | 2004 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,182 | $1,000 | Not Implemented |
UM0266 # 10 Y:2004 | 10 | 2004 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $666 | $610 | Implemented |
UM0266 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $1,195 | $603 | Not Implemented |
UM0266 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,042 | $900 | Implemented |
UM0266 # 06 Y:2004 | 06 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,400 | $700 | Not Implemented |
UM0266 # 01 Y:2004 | 01 | 2004 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $11,825 | $4,500 | Implemented |
UM0266 # 07 Y:2004 | 07 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,312 | $3,500 | Not Implemented |
UM0266 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,847 | $2,000 | Implemented |
UM0266 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,131 | $7,512 | Implemented |
GT0788 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,396 | $3,768 | Implemented |
GT0788 # 09 Y:2004 | 09 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $760 | $1,200 | Implemented |
GT0788 # 10 Y:2004 | 10 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,462 | $1,000 | Not Implemented |
GT0788 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $144 | $1,100 | Implemented |
GT0788 # 02 Y:2004 | 02 | 2004 | COMBINE UTILITY METERS | $16,373 | $0 | Not Implemented |
GT0788 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,315 | $31,400 | Not Implemented |
GT0788 # 05 Y:2004 | 05 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $8,123 | $3,450 | Implemented |