Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,107
matching recommendationsSIC | 3441 | Fabricated Structural Metal |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TS0028 # 02 Y:1985 | 02 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,428 | $0 | Not Implemented |
TS0028 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $811 | $300 | Not Implemented |
TS0029 # 01 Y:1985 | 01 | 1985 | OPTIMIZE PLANT POWER FACTOR | $65,767 | $60,000 | Not Implemented |
TS0029 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,874 | $100 | Not Implemented |
TS0029 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,514 | $2,892 | Not Implemented |
PV0003 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $478 | $0 | Not Implemented |
PV0003 # 02 Y:1985 | 02 | 1985 | USE RADIANT HEATER FOR SPOT HEATING | $253 | $1,650 | Not Implemented |
ST0032 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $514 | $64 | Implemented |
ST0032 # 02 Y:1985 | 02 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $72 | $42 | Not Implemented |
ST0032 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,640 | $688 | Not Implemented |
ST0032 # 04 Y:1985 | 04 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $890 | $1,900 | Implemented |
ST0032 # 05 Y:1985 | 05 | 1985 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,974 | $900 | Not Implemented |
ST0032 # 06 Y:1985 | 06 | 1985 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $2,416 | $5,000 | Not Implemented |
ST0032 # 07 Y:1985 | 07 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $305 | $0 | Not Implemented |
ST0032 # 08 Y:1985 | 08 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $380 | $1,140 | Not Implemented |
ST0032 # 09 Y:1985 | 09 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $503 | $380 | Not Implemented |
KU0155 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,743 | $948 | Implemented |
KU0155 # 02 Y:1985 | 02 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,311 | $278 | Implemented |
KU0155 # 03 Y:1985 | 03 | 1985 | IMPROVE LUBRICATION PRACTICES | $2,931 | $0 | Implemented |
KU0155 # 04 Y:1985 | 04 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,855 | $0 | Not Implemented |
KU0155 # 05 Y:1985 | 05 | 1985 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,055 | $20 | Not Implemented |
KU0155 # 06 Y:1985 | 06 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $851 | $300 | Implemented |
KU0155 # 07 Y:1985 | 07 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $327 | $50 | Not Implemented |
KU0155 # 08 Y:1985 | 08 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $305 | $20 | Not Implemented |
KU0155 # 09 Y:1985 | 09 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,418 | $0 | Implemented |