IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0266 # 07 Y:2025 07 2025 OPTIMIZE PLANT POWER FACTOR $8,550 $22,000 n/a
UU0266 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $633 $543 n/a
UU0266 # 05 Y:2025 05 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,730 $6,960 n/a
UU0266 # 04 Y:2025 04 2025 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,500 $38,200 n/a
UU0266 # 03 Y:2025 03 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $52,801 $18,500 n/a
UU0266 # 02 Y:2025 02 2025 USE RADIANT HEATER FOR SPOT HEATING $8,217 $13,000 n/a
UU0266 # 01 Y:2025 01 2025 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,681 $22,500 n/a
UU0058 # 02 Y:2004 02 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $21,233 $78,000 Not Implemented
UU0058 # 08 Y:2004 08 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $584 $0 Not Implemented
UU0058 # 07 Y:2004 07 2004 COMBINE UTILITY METERS $10,270 $0 Implemented
UU0058 # 06 Y:2004 06 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,353 $0 Implemented
UU0058 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,714 $1,010 Implemented
UU0058 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,398 $308 Not Implemented
UU0058 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $6,081 $5,369 Not Implemented
UU0058 # 01 Y:2004 01 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $54,124 $150,000 Not Implemented
UU0028 # 08 Y:2002 08 2002 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $147,880 $100,000 Not Implemented
UU0028 # 07 Y:2002 07 2002 INSTALL SKYLIGHTS $17,689 $2,800 Not Implemented
UU0028 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,400 $2,000 Implemented
UU0028 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $844 $406 Implemented
UU0028 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,450 $700 Implemented
UU0028 # 03 Y:2002 03 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $30,500 $7,600 Implemented
UU0028 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $5,590 $9,800 Implemented
UU0028 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $986 $0 Implemented
UU0008 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,523 $125 Implemented
UU0008 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,236 $1,844 Not Implemented