Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 3441 | Fabricated Structural Metal |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0540 # 05 Y:1998 | 05 | 1998 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,226 | $5,610 | n/a |
OK0540 # 04 Y:1998 | 04 | 1998 | INSTALL OCCUPANCY SENSORS | $783 | $1,188 | n/a |
OK0540 # 03 Y:1998 | 03 | 1998 | OPTIMIZE PLANT POWER FACTOR | $2,129 | $0 | n/a |
OK0540 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,180 | $2,828 | n/a |
OK0540 # 01 Y:1998 | 01 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $5,006 | $9,000 | n/a |
OK0540 # 06 Y:1998 | 06 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $6,531 | $0 | n/a |
UM0117 # 07 Y:1998 | 07 | 1998 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $11,000 | $11,000 | Not Implemented |
UM0117 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $558 | $918 | Implemented |
UM0117 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,896 | $9,124 | Implemented |
UM0117 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $724 | $1,000 | Implemented |
UM0117 # 04 Y:1998 | 04 | 1998 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,314 | $658 | Implemented |
UM0117 # 05 Y:1998 | 05 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $14,400 | $1,000 | Not Implemented |
UM0117 # 06 Y:1998 | 06 | 1998 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $2,059 | $250 | Implemented |
AS0220 # 06 Y:1998 | 06 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $630 | $600 | Not Implemented |
AS0220 # 13 Y:1998 | 13 | 1998 | ADD ADDITIONAL PRODUCTION SHIFT | $495,547 | $14,720 | Implemented |
AS0220 # 12 Y:1998 | 12 | 1998 | ADOPT IN-HOUSE MATERIAL GENERATION | $192,015 | $2,940 | Not Implemented |
AS0220 # 11 Y:1998 | 11 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,179 | $90 | Implemented |
AS0220 # 10 Y:1998 | 10 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,606 | $5,027 | Not Implemented |
AS0220 # 09 Y:1998 | 09 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,801 | $100 | Implemented |
AS0220 # 08 Y:1998 | 08 | 1998 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,895 | $12,030 | Implemented |
AS0220 # 07 Y:1998 | 07 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,924 | $60 | Not Implemented |
AS0220 # 05 Y:1998 | 05 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $344 | $300 | Not Implemented |
AS0220 # 04 Y:1998 | 04 | 1998 | DISCONNECT BALLASTS | $355 | $15 | Implemented |
AS0220 # 03 Y:1998 | 03 | 1998 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,126 | $275 | Implemented |
AS0220 # 02 Y:1998 | 02 | 1998 | INSTALL OCCUPANCY SENSORS | $519 | $525 | Not Implemented |