Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
859
matching recommendationsSIC | 3442 | Metal Doors, Sash, And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NV0081 # 06 Y:1997 | 06 | 1997 | USE OPTIMUM THICKNESS INSULATION | $2,717 | $11,160 | Not Implemented |
NV0081 # 07 Y:1997 | 07 | 1997 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $1,164 | $2,120 | Implemented |
NV0081 # 08 Y:1997 | 08 | 1997 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $30,328 | $155,000 | Not Implemented |
NV0081 # 09 Y:1997 | 09 | 1997 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $60,656 | $12,000 | Implemented |
NV0081 # 10 Y:1997 | 10 | 1997 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,164 | $20,000 | Not Implemented |
NV0081 # 11 Y:1997 | 11 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $8,160 | $20,000 | Implemented |
NV0081 # 12 Y:1997 | 12 | 1997 | USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY | $2,040 | $0 | Not Implemented |
WV0118 # 01 Y:1997 | 01 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $535 | $610 | Implemented |
WV0118 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,026 | $200 | Implemented |
WV0118 # 03 Y:1997 | 03 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $368 | $755 | Not Implemented |
WV0118 # 04 Y:1997 | 04 | 1997 | INSULATE BARE EQUIPMENT | $890 | $1,440 | Not Implemented |
WV0118 # 05 Y:1997 | 05 | 1997 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,763 | $10,400 | Implemented |
WV0118 # 06 Y:1997 | 06 | 1997 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $2,250 | $4,720 | Not Implemented |
WV0118 # 07 Y:1997 | 07 | 1997 | MINIMIZE WATER USAGE | $2,043 | $2,000 | Implemented |
WV0118 # 08 Y:1997 | 08 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $19,200 | $1,700 | Implemented |
OD0080 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $85 | $247 | Not Implemented |
OD0080 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,090 | $150 | Implemented |
OD0080 # 03 Y:1997 | 03 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $758 | $320 | Implemented |
OD0080 # 04 Y:1997 | 04 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $65 | $0 | Implemented |
OD0080 # 05 Y:1997 | 05 | 1997 | INSTALL TIMERS AND/OR THERMOSTATS | $563 | $210 | Implemented |
OD0080 # 06 Y:1997 | 06 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,392 | $0 | Not Implemented |
AR0110 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,096 | $4,230 | Implemented |
AR0110 # 02 Y:1997 | 02 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $604 | $0 | Not Implemented |
AR0110 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,619 | $687 | Implemented |
AR0110 # 04 Y:1997 | 04 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,231 | $4,404 | Not Implemented |