IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

152

matching recommendations
Reset
SIC 3442 Metal Doors, Sash, And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0119 # 08 Y:1998 08 1998 USE OPTIMUM THICKNESS INSULATION $549 $2,127 n/a
BD0119 # 09 Y:1998 09 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $382 $430 n/a
BD0119 # 10 Y:1998 10 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $205 n/a
BD0119 # 11 Y:1998 11 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $132,757 $160,000 n/a
BD0119 # 12 Y:1998 12 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,430 $14,000 n/a
BD0119 # 13 Y:1998 13 1998 RECOVER AND REUSE WASTE MATERIAL $2,982 $7,000 n/a
BD0119 # 14 Y:1998 14 1998 MOVE PRODUCT USING MECHANICAL MEANS $4,359 $14,000 n/a
BD0119 # 15 Y:1998 15 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,737 $1,365 n/a
BD0056 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,744 $7,010 Implemented
BD0056 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,746 $3,208 Implemented
BD0056 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $1,033 $825 Not Implemented
BD0056 # 04 Y:1996 04 1996 USE SYNTHETIC LUBRICANT $546 $175 Not Implemented
BD0056 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,490 $900 Implemented
BD0056 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $410 $400 Implemented
BD0056 # 07 Y:1996 07 1996 RECOVER AND REUSE COOLING WATER $16,777 $3,600 Implemented
BD0056 # 08 Y:1996 08 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,702 $750 Not Implemented
BD0056 # 09 Y:1996 09 1996 USE MINIMUM COOLING WATER TO BEARINGS $1,389 $425 Implemented
BD0059 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,814 $3,671 Implemented
BD0059 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,601 $6,270 Implemented
BD0059 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,408 $750 Implemented
BD0059 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $1,101 $825 Not Implemented
BD0059 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $543 $750 Not Implemented
BD0059 # 06 Y:1996 06 1996 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $26,027 $7,500 Implemented
BD0059 # 07 Y:1996 07 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $9,618 $370 Not Implemented
BD0059 # 08 Y:1996 08 1996 USE MINIMUM COOLING WATER TO BEARINGS $684 $425 Implemented