IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

849

matching recommendations
Reset
SIC 3442 Metal Doors, Sash, And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0512 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,848 $100 Implemented
IA0512 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,424 $70 Implemented
IA0512 # 04 Y:2013 04 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $629 $890 Not Implemented
IA0512 # 05 Y:2013 05 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $504 $530 Not Implemented
IA0512 # 06 Y:2013 06 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $277 $200 Implemented
IA0512 # 07 Y:2013 07 2013 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $17,286 $135,000 Not Implemented
IP0013 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,266 $0 Implemented
IP0013 # 02 Y:2013 02 2013 APPLY FOR INVESTMENT INCENTIVES $4,197 $0 Not Implemented
IP0013 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $907 $0 Not Implemented
IP0013 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $192 $0 Implemented
IP0013 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,079 $1,148 Not Implemented
IP0013 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $4,447 $2,744 Implemented
IP0013 # 07 Y:2013 07 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,251 $4,863 Not Implemented
IP0013 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $633 $1,535 Not Implemented
IP0013 # 09 Y:2013 09 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,354 $2,340 Implemented
IP0013 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,491 $15,502 Implemented
IA0490 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,645 $19,693 Implemented
IA0490 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $333 $478 Not Implemented
IA0490 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,882 $1,500 Implemented
IA0490 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $4,416 $1,260 Implemented
IA0490 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,136 $1,440 Not Implemented
LE0344 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,461 $11,250 Not Implemented
LE0344 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $3,730 $10,374 Not Implemented
LE0344 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,467 $6,930 Not Implemented
LE0344 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,478 $9,168 Not Implemented