IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0225 # 14 Y:2001 14 2001 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $1,001 $2,500 Implemented
WV0225 # 13 Y:2001 13 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $275 $1,044 Implemented
WV0225 # 10 Y:2001 10 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $683 $250 Implemented
WV0225 # 09 Y:2001 09 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $733 $104 Implemented
WV0225 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $453 $44 Implemented
WV0225 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $674 $386 Implemented
WV0225 # 04 Y:2001 04 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,177 $1,320 Implemented
WV0225 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,134 $528 Implemented
OK0620 # 05 Y:2001 05 2001 INSTALL SET-BACK TIMERS $8,700 $1,170 Implemented
OK0620 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,130 $40 Implemented
OK0620 # 04 Y:2001 04 2001 REPAIR AND ELIMINATE STEAM LEAKS $1,442 $200 Implemented
OK0620 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $238 $1,470 Implemented
OK0620 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,592 $615 Implemented
IA0271 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,886 $0 Implemented
IA0271 # 12 Y:2001 12 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,550 $3,400 Implemented
IA0271 # 10 Y:2001 10 2001 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $68,080 $16,000 Implemented
IA0271 # 08 Y:2001 08 2001 $256,000 $60,000 Implemented
IA0271 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,698 $856 Implemented
IA0271 # 03 Y:2001 03 2001 AIR CONDITION ONLY SPACE NECESSARY $1,333 $384 Implemented