Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
91
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0222 # 02 Y:2002 | 02 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $23,074 | $1,750 | Implemented |
UM0222 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,261 | $4,000 | Not Implemented |
UM0222 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,900 | $1,275 | Implemented |
UM0222 # 01 Y:2002 | 01 | 2002 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $28,900 | $10,000 | Implemented |
UM0222 # 04 Y:2002 | 04 | 2002 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,523 | $2,000 | Not Implemented |
WV0225 # 10 Y:2001 | 10 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $683 | $250 | Implemented |
WV0225 # 07 Y:2001 | 07 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,519 | $1,500 | Not Implemented |
WV0225 # 12 Y:2001 | 12 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $699 | $2,655 | Not Implemented |
WV0225 # 05 Y:2001 | 05 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $674 | $386 | Implemented |
WV0225 # 06 Y:2001 | 06 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,187 | $2,058 | Not Implemented |
WV0225 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,134 | $528 | Implemented |
WV0225 # 04 Y:2001 | 04 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,177 | $1,320 | Implemented |
WV0225 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $6,690 | $5,084 | Not Implemented |
WV0225 # 11 Y:2001 | 11 | 2001 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,221 | $4,450 | Not Implemented |
WV0225 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $453 | $44 | Implemented |
WV0225 # 14 Y:2001 | 14 | 2001 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $1,001 | $2,500 | Implemented |
WV0225 # 13 Y:2001 | 13 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $275 | $1,044 | Implemented |
WV0225 # 01 Y:2001 | 01 | 2001 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $720 | $4,100 | Not Implemented |
WV0225 # 09 Y:2001 | 09 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $733 | $104 | Implemented |
WV0225 # 15 Y:2001 | 15 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $35,000 | $10,440 | Not Implemented |
UD0533 # 07 Y:1997 | 07 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $37,000 | $36,000 | Implemented |
UD0533 # 06 Y:1997 | 06 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,574 | $20,000 | Not Implemented |
UD0533 # 09 Y:1997 | 09 | 1997 | MINIMIZE WATER USAGE | $125 | $60 | Not Implemented |
UD0533 # 08 Y:1997 | 08 | 1997 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $101 | $50 | Implemented |
UD0533 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,455 | $2,564 | Implemented |