Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,214
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0514 # 08 Y:2014 | 08 | 2014 | INSTALL OCCUPANCY SENSORS | $3,435 | $868 | Implemented |
NC0514 # 09 Y:2014 | 09 | 2014 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,213 | $1,017 | Not Implemented |
NC0514 # 10 Y:2014 | 10 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,110 | $200 | Implemented |
OK0874 # 01 Y:2014 | 01 | 2014 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $380 | $112 | Implemented |
OK0874 # 02 Y:2014 | 02 | 2014 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $3,364 | $1,568 | Implemented |
OK0874 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,682 | $0 | Implemented |
OK0874 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,847 | $980 | Implemented |
OK0874 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,899 | $21,005 | Not Implemented |
OK0874 # 06 Y:2014 | 06 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $934 | $1,024 | Implemented |
LE0370 # 01 Y:2014 | 01 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $3,349 | $0 | Implemented |
LE0370 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,947 | $35 | Implemented |
LE0370 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,490 | $200 | Implemented |
LE0370 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,076 | $1,000 | Implemented |
LE0370 # 05 Y:2014 | 05 | 2014 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,981 | $2,653 | Implemented |
LE0370 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,997 | $4,187 | Not Implemented |
LE0370 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,755 | $1,688 | Not Implemented |
LE0370 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,133 | $15,100 | Not Implemented |
LE0370 # 09 Y:2014 | 09 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,137 | $6,750 | Not Implemented |
LE0370 # 10 Y:2014 | 10 | 2014 | REPLACE BOILER | $61,996 | $205,000 | Not Implemented |
LE0370 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,070 | $75,880 | Not Implemented |
MZ0134 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $53,250 | $61,965 | Implemented |
MZ0134 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $22,321 | $12,640 | Not Implemented |
MZ0134 # 03 Y:2013 | 03 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,044 | $2,500 | Implemented |
MZ0134 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,322 | $1,333 | Not Implemented |
MZ0134 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,688 | $16,575 | Not Implemented |