Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,214
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0466 # 04 Y:2004 | 04 | 2004 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,435 | $10,000 | Not Implemented |
WI0466 # 05 Y:2004 | 05 | 2004 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $3,550 | $0 | Not Implemented |
WI0466 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,755 | $1,000 | Not Implemented |
WI0466 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,231 | $740 | Not Implemented |
MI0071 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $491 | $2,100 | Implemented |
MI0071 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $-1,062 | $2,080 | Implemented |
MI0071 # 03 Y:2004 | 03 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $808 | $2,527 | Implemented |
MI0071 # 04 Y:2004 | 04 | 2004 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $10,520 | $2,160 | Not Implemented |
MI0071 # 05 Y:2004 | 05 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $4,800 | $2,080 | Implemented |
MI0071 # 06 Y:2004 | 06 | 2004 | REDUCE SCRAP PRODUCTION | $76,111 | $10,040 | Not Implemented |
MI0071 # 07 Y:2004 | 07 | 2004 | EXPAND OPERATIONS INTO UNUSED SPACE | $3,300 | $30 | Not Implemented |
MI0071 # 08 Y:2004 | 08 | 2004 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $53,591 | $28,480 | Implemented |
UU0056 # 01 Y:2003 | 01 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $335 | $1,600 | Not Implemented |
UU0056 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $325 | $121 | Implemented |
UU0056 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $244 | $58 | Implemented |
UU0056 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $223 | $136 | Not Implemented |
UU0056 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $190 | $266 | Not Implemented |
UU0056 # 06 Y:2003 | 06 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $110 | $490 | Implemented |
MS0233 # 01 Y:2003 | 01 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $200,928 | $9,650 | Implemented |
MS0233 # 02 Y:2003 | 02 | 2003 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $67,762 | $79,500 | Not Implemented |
MS0233 # 03 Y:2003 | 03 | 2003 | OPTIMIZE PLANT POWER FACTOR | $19,274 | $21,420 | Implemented |
MS0233 # 04 Y:2003 | 04 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,291 | $36,800 | Implemented |
MS0233 # 05 Y:2003 | 05 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $11,372 | $2,900 | Implemented |
MS0233 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,999 | $748 | Implemented |
MS0233 # 07 Y:2003 | 07 | 2003 | USE SYNTHETIC LUBRICANT | $3,787 | $1,210 | Implemented |