Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
186
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0874 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,899 | $21,005 | Not Implemented |
OK0874 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,682 | $0 | Implemented |
OK0874 # 06 Y:2014 | 06 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $934 | $1,024 | Implemented |
OK0860 # 05 Y:2013 | 05 | 2013 | INCREASE AMOUNT OF CONDENSATE RETURNED | $3,223 | $3,250 | Not Implemented |
OK0860 # 12 Y:2013 | 12 | 2013 | INSTALL OCCUPANCY SENSORS | $445 | $3,675 | Implemented |
OK0860 # 09 Y:2013 | 09 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,499 | $3,850 | Not Implemented |
OK0860 # 10 Y:2013 | 10 | 2013 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $14,580 | $12,694 | Not Implemented |
OK0860 # 11 Y:2013 | 11 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $32,972 | $69,860 | Not Implemented |
OK0860 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $986 | $513 | Not Implemented |
OK0860 # 08 Y:2013 | 08 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,206 | $847 | Not Implemented |
OK0860 # 04 Y:2013 | 04 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,366 | $14,850 | Not Implemented |
OK0860 # 03 Y:2013 | 03 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $3,126 | $26,250 | Not Implemented |
OK0860 # 01 Y:2013 | 01 | 2013 | INSTALL SET-BACK TIMERS | $3,227 | $1,723 | Not Implemented |
OK0860 # 02 Y:2013 | 02 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,823 | $5,100 | Not Implemented |
OK0860 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,722 | $1,750 | Implemented |
AM0586 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,330 | $42,750 | Not Implemented |
AM0586 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,790 | $3,000 | Implemented |
AM0586 # 03 Y:2010 | 03 | 2010 | MODIFY WORKLOAD | $19,890 | $0 | Not Implemented |
AM0586 # 07 Y:2010 | 07 | 2010 | USE SYNTHETIC LUBRICANT | $2,195 | $0 | Not Implemented |
AM0586 # 05 Y:2010 | 05 | 2010 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $13,725 | $0 | Implemented |
AM0586 # 04 Y:2010 | 04 | 2010 | OPTIMIZE PLANT POWER FACTOR | $13,800 | $53,380 | Not Implemented |
AM0586 # 08 Y:2010 | 08 | 2010 | USE PHOTOCELL CONTROLS | $1,345 | $200 | Not Implemented |
AM0586 # 06 Y:2010 | 06 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,660 | $2,040 | Not Implemented |
AM0506 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,260 | $25 | Implemented |
AM0506 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $950 | $250 | Implemented |