IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,214

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0271 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,886 $0 Implemented
IA0271 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $789 $1,131 Not Implemented
IA0271 # 03 Y:2001 03 2001 AIR CONDITION ONLY SPACE NECESSARY $1,333 $384 Implemented
IA0271 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,698 $856 Implemented
IA0271 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $949 $165 Not Implemented
IA0271 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $251 $300 Not Implemented
IA0271 # 07 Y:2001 07 2001 INSTALL AUTOMATIC STACK DAMPER $6,759 $7,000 Not Implemented
IA0271 # 08 Y:2001 08 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $256,000 $60,000 Implemented
IA0271 # 09 Y:2001 09 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $128,000 $90,960 Not Implemented
IA0271 # 10 Y:2001 10 2001 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $68,080 $16,000 Implemented
IA0271 # 11 Y:2001 11 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $100,000 $100,000 Not Implemented
IA0271 # 12 Y:2001 12 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,550 $3,400 Implemented
AM0382 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $10,200 $11,290 Not Implemented
AM0382 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,860 $2,000 Implemented
AM0382 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,030 $0 Implemented
AM0382 # 04 Y:2000 04 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,440 $780 Not Implemented
AM0382 # 05 Y:2000 05 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,020 $5,500 Implemented
AM0382 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $180 Not Implemented
BD0173 # 01 Y:2000 01 2000 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $31,116 $16,000 n/a
BD0173 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,742 $600 Implemented
BD0173 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,471 $1,000 Not Implemented
BD0173 # 04 Y:2000 04 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,576 $10,000 Not Implemented
BD0173 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $1,220 $1,050 Not Implemented
BD0173 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $805 $660 Not Implemented
BD0173 # 07 Y:2000 07 2000 RECOVER WASTE HEAT FROM EQUIPMENT $664 $750 Not Implemented