IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,214

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0218 # 07 Y:1999 07 1999 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $3,187 $2,656 Not Implemented
IA0209 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,970 $3,670 Implemented
IA0209 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,774 $871 Implemented
IA0209 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $530 $399 Not Implemented
IA0209 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $255 $50 Not Implemented
IA0209 # 05 Y:1998 05 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $68,734 $2,250 Not Implemented
IA0209 # 06 Y:1998 06 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $6,857 $7,990 Implemented
IA0209 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $115,785 $151,000 Not Implemented
IA0209 # 08 Y:1998 08 1998 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $50,000 $47,669 Not Implemented
MS0114 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $9,292 $3,361 Not Implemented
MS0114 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $463 $710 Not Implemented
MS0114 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,444 $892 Implemented
MS0114 # 04 Y:1998 04 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,750 $0 Not Implemented
MS0114 # 05 Y:1998 05 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,460 $954 Not Implemented
MS0114 # 06 Y:1998 06 1998 USE SYNTHETIC LUBRICANT $577 $308 Implemented
MS0114 # 07 Y:1998 07 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $15,435 $2,360 Not Implemented
MS0114 # 08 Y:1998 08 1998 BURN WASTE OIL FOR HEAT $1,919 $2,862 Not Implemented
MS0114 # 09 Y:1998 09 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,506 $4,518 Not Implemented
UF0203 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,508 $582 Not Implemented
UF0203 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,287 $1,200 Implemented
UF0203 # 03 Y:1998 03 1998 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,304 $5,200 Not Implemented
UF0203 # 04 Y:1998 04 1998 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,194 $4,200 Not Implemented
UF0203 # 05 Y:1998 05 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,933 $11,000 Implemented
UF0203 # 06 Y:1998 06 1998 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $14,296 $1,175 Not Implemented
UF0203 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,277 $4,000 Implemented