Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0326 # 08 Y:2003 | 08 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $2,034 | $500 | Not Implemented |
SD0326 # 07 Y:2003 | 07 | 2003 | USE PHOTOCELL CONTROLS | $4,846 | $6,000 | Not Implemented |
SD0326 # 04 Y:2003 | 04 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $14,893 | $7,700 | Not Implemented |
SD0326 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,397 | $4,000 | Implemented |
SD0326 # 06 Y:2003 | 06 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,905 | $7,000 | Not Implemented |
SD0326 # 03 Y:2003 | 03 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,861 | $20,000 | Not Implemented |
SD0326 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,795 | $384 | Not Implemented |
SD0326 # 01 Y:2003 | 01 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $44,623 | $0 | Not Implemented |
SD0220 # 07 Y:1999 | 07 | 1999 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $51,493 | $8,000 | Implemented |
SD0220 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,040 | $5,528 | Implemented |
SD0220 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,440 | $500 | Implemented |
SD0220 # 03 Y:1999 | 03 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $55,972 | $80,000 | Not Implemented |
SD0220 # 05 Y:1999 | 05 | 1999 | CONVERT TO AQUEOUS CLEANING | $7,548 | $0 | Implemented |
SD0220 # 06 Y:1999 | 06 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $7,710 | $8,500 | Implemented |
SD0220 # 04 Y:1999 | 04 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $17,838 | $732 | Implemented |
SD0191 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,838 | $5,890 | Implemented |
SD0191 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $45,498 | $34,650 | Not Implemented |
SD0191 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,897 | $1,800 | Not Implemented |
SD0191 # 04 Y:1998 | 04 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,084 | $41,850 | Not Implemented |
SD0191 # 05 Y:1998 | 05 | 1998 | USE OPTIMUM THICKNESS INSULATION | $3,919 | $5,418 | Not Implemented |
SD0191 # 06 Y:1998 | 06 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $18,900 | $8,500 | Implemented |
SD0191 # 07 Y:1998 | 07 | 1998 | CONVERT TO LESS TOXIC HYDROCARBON CLEANERS | $15,696 | $1,450 | Not Implemented |
SD0191 # 08 Y:1998 | 08 | 1998 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $12,650 | $0 | Implemented |
SD0191 # 09 Y:1998 | 09 | 1998 | TREAT AND REUSE RINSE WATERS | $654 | $750 | Implemented |
SD0191 # 10 Y:1998 | 10 | 1998 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $28,755 | $200,000 | Not Implemented |